Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />

Chapter – II – Special Condition of Contract<br />

iii.<br />

Cancel the contract and purchase or authorise the purchase of the stores or<br />

others of a similar description (when stores exactly complying with the<br />

particulars are not readily available, in the opinion of the purchaser, which shall<br />

be final) and action will be taken as per Clause 2.8 of Chapter II, Special<br />

Conditions of Contract.<br />

2.21 RIGHT TO <strong>RAILWAY</strong> TO KEEP BACK FROM THE CONTRACT OR<br />

ANY PORTION <strong>OF</strong> THE WORK.<br />

The successful tenderer will however, have no claim or right in the execution of<br />

work which in the opinion of the Engineer should be carried out departmentally<br />

or otherwise and the Railway reserves the right that any time after acceptance of<br />

the tender, to keep back from the contract and carry out the work or any portion<br />

of work, through any other agent. No claim for compensation/loss or<br />

whatsoever on this account will be entertained by the Railways.<br />

2.22 SUBLETTING AND ASSIGNMENT:<br />

(i) The contractor may sublet a part of the works under this contract and enter into<br />

contract with suppliers for supply of materials.<br />

(ii) The names of all subject contractors proposed to be employed for execution of<br />

work or any part thereof including manufacturing of equipment and other<br />

materials shall be submitted by the contractor to the Railway and got approved<br />

by him before the contractor enter into an agreement with the sub contractor for<br />

the purchase.<br />

(iii) The contractor shall arrange for effective supervision of sub contractor’s work<br />

and remain solely responsible for materials supplied and for works carried out<br />

on his behalf by the sub contractor. The contractor shall not, save with the<br />

previous consent in writing of the Purchaser, sublet, transfer or assign the<br />

contract or any part thereof or interest therein or benefit or advantage thereof<br />

any manner whatsoever.<br />

In the event of the Contractor’s subletting of assigning this contract or any part<br />

thereof without such permission, the Railway shall be entitled to cancel the<br />

contract and action will be taken as per Clause 2.8 of Chapter II, Special<br />

Conditions of Contract.<br />

2.23 EXECUTION <strong>OF</strong> WORK<br />

All the work shall be executed in strict conformity to the provisions of the<br />

contract document and with such explanatory detailed drawings, specifications<br />

and instructions as may be approved from time to time by the Railways, based<br />

Divisional Railway Manager (S & T) Ahmedabad-45<br />

For & on behalf of the president of India<br />

Chapter- II Page 17 of 32