Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />
Chapter – II – Special Condition of Contract<br />
2.4 Quantum of Work, Recommended Spares & Optional Items:<br />
(i) The estimated quantities of various items required to be installed and<br />
commissioned are mentioned in the Tender Schedule. It should be clearly noted<br />
that the items and the quantities mentioned have been worked out by Railways<br />
as per the estimated requirements. However if the Tenderer feels that the desired<br />
features can not be achieved or some of the essential features can not be<br />
obtained through the quantities provided in the Tender Schedule, then quantity<br />
as required for the work in the opinion of the Tenderer shall be quoted as<br />
additional items and/or quantity. In such cases, Tenderer shall give, full<br />
justification for such variation, clearly mentioning the consequences of<br />
procuring the quantities suggested by the contractor instead of quantities<br />
indicated in schedule.<br />
(ii) Similarly for any other item(s) necessary for satisfactory completion/<br />
functioning of the tendered work in accordance with the objective of<br />
requirement, rates and quantities of such item(s) shall be quoted separately,<br />
along with detailed justification for the need of the item(s) to achieve end<br />
objective.<br />
(iii) Costs for additional items mentioned above shall be quoted separately wherever<br />
necessary which shall not be taken into account for evaluation criteria of the<br />
offers.<br />
(iv)<br />
Railway reserves the right to include any of the additional items which shall be<br />
binding on the contractor.<br />
2.5 PRICE VARIATION CLAUSE (PVC): No price variation will be applicable.<br />
2.6 PERFORMANCE GUARANTEE:<br />
Revised Clause 16(4) to Indian Railways General Conditions of contract<br />
{Ref: Item-1 to Railway Boards letter no.2007/CE.I/CT/18 Pt.XII dated:<br />
31.12.2010} Clause 16(4). Performance Guarantee<br />
The procedure for obtaining Performance Guarantee is outlined below:<br />
(a)<br />
The successful bidder shall have to submit a Performance Guarantee (PG)<br />
within 30 (thirty) days from the date of issue of Letter of Acceptance (LOA).<br />
Extension of time for submission of PG beyond 30 (thirty) days and upto 60<br />
days from the date of issue of LOA may be given by the authority who is<br />
competent to sign the contract agreement. However a penal interest of 15%<br />
per annum shall be charged for the delay beyond 30 (thirty) days, i.e. from<br />
31 st day after the date of issue of LOA. In case the contractor fails to submit<br />
the requisite PG even after 60 days from the date of issue of LOA the contract<br />
Divisional Railway Manager (S & T) Ahmedabad-45<br />
For & on behalf of the president of India<br />
Chapter- II Page 3 of 32