Tender No DRM/S&T(ADI)/ Tele/ 02 of 2012-13<br />

Chapter – II – Special Condition of Contract<br />

2.13 QUALITY ASSURANCE DOCUMENTATION (FOR SUPPLY <strong>OF</strong><br />

MATERIALS):<br />

(i) The Tenderer shall submit the quality control plan alongwith the tender including<br />

full details of in-house quality assurance organization, procedures and<br />

documentation. During the manufacturing process, proper record shall be<br />

maintained for the purpose of inspections and all the tests should be carried out<br />

according to that.<br />

(ii) In the event of Railways waving off the inspection, all tests provided in the test<br />

schedules approved by Railways shall be carried out by the quality assurance<br />

organization and proper record of all such tests and results thereof shall be<br />

maintained and supplied to railways on demand along with the supply.<br />

(iii) It is desirable that Tenderer has to submit detail list of acceptance test &<br />

procedure, method of test required to be carried out by the railway for the<br />

assurance of the quality and real functionality of the system.<br />

2.14. FUTURE AVAILABILITY <strong>OF</strong> SPARES AND ADDITIONAL PARTS:<br />

For future expansion maintenance of the system, spares and additional parts or<br />

other components shall be required by the Railways. Tenderer shall guarantee that<br />

Spares and such additional parts will be supplied as and when railways place<br />

order for the same, therefore firm has to give detailed specification of the items<br />

being used & supplied by him as ordering details. Tenderer shall also provide<br />

warranty that this material will be supplied at a rate not exceeding the rate<br />

accepted by the Railways which is shown in the break-up of the costs in Schedule<br />

of Work upto the expiry of warranty period. Any order placed by railways on the<br />

Contractor within the expiry of warranty period will be fully honoured and the<br />

materials will be supplied within the period of 60 days or as required by the<br />

railway. The fact that contractor is supplying some materials from 3 rd party will<br />

not absolve the tenderer from his responsibility.<br />

2.15. TEST & MEASURING INSTRUMENTS, SPECIAL TOOLS AND<br />

INSTALLATION MATERIAL:<br />

(i)<br />

(ii)<br />

All tests and measuring instruments and other arrangements required for all the<br />

acceptance tests shall be made available by the contractor free of cost for<br />

conducting the tests.<br />

Special tools required for installation and maintenance of all the equipments shall<br />

be arranged by the contractor in adequate quantities. The contractor shall provide<br />

all installation material for complete commissioning of the system.<br />

Divisional Railway Manager (S & T) Ahmedabad-45<br />

For & on behalf of the president of India<br />

Chapter- II Page 11 of 32