You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ITU-R Outside ITU-R<br />
Step 1<br />
Circular Letter to invite<br />
proposals for radio interface<br />
technologies and evaluations<br />
Step 3<br />
Submission/Reception of the<br />
RIT and SRIT proposals and<br />
acknowledgement of receipt<br />
Step 5<br />
Review and coordination of<br />
outside evaluation activities<br />
Step 6<br />
Review to assess<br />
compliance with minimum<br />
requirements<br />
Step 7<br />
Consideration of evaluation<br />
results, consensus building,<br />
and decision<br />
Step 8<br />
Development of radio interface<br />
Recommendation(s)<br />
Step 2<br />
Development of candidate<br />
radio interface technologies<br />
Step 4<br />
Evaluation of candidate radio<br />
interface technologies by<br />
independent evaluation groups,<br />
grouping of the technologies<br />
through consensus building<br />
Coordination between evaluation groups<br />
Descriptions of proposed radio<br />
interface technologies and<br />
evaluation reports<br />
Radio interface specifications<br />
(RSPECs), sufficiently detailed to<br />
enable worldwide compatibility<br />
Step 9<br />
Implementation of<br />
Recommendation(s)<br />
[IMT-Advanced A2-02]<br />
Figure F.2. IMT-Advanced Terrestrial Component Radio Interface Development Process. 166<br />
The Circular Letter Addendum draws attention to the IMT-Advanced Web page. Of note is the Document<br />
Report ITU-R M.2133, Requirements, Evaluation Criteria, and Submission Templates for the<br />
Development of IMT-Advanced.<br />
Report ITU-R M.2133 supports the process for IMT-Advanced initiated by Circular Letter 5/LCCE/2 and its<br />
Addendums. It provides the requirements, evaluation criteria, as well as submission templates required<br />
for a complete submission of candidate RITs and candidate SRITs for IMT-Advanced. In essence, it can<br />
166 Revision 1 to ITU-R ADV/2-E, Working Party 5D, Submission And Evaluation Process and Consensus Building.<br />
www.4gamericas.org February 2011 Page 169