nymtc regional freight plan - New York Metropolitan Transportation ...
nymtc regional freight plan - New York Metropolitan Transportation ...
nymtc regional freight plan - New York Metropolitan Transportation ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A Freight Plan for the NYMTC Region<br />
<strong>Transportation</strong> Impacts<br />
While the construction of new float bridges would improve the reliability of float operations,<br />
as an independent action it is not expected to significantly increase Cross-Hudson<br />
<strong>freight</strong> volume.<br />
Other Impacts<br />
Few significant environmental impacts are likely to be associated with this project. The<br />
project can slightly improve <strong>regional</strong> connectivity in the Northern and Southern Crossing<br />
corridors. There are no major physical barriers to improving float service. Institutional<br />
barriers are significant, however, involving coordination across bi-state entities and<br />
among private railroad operators. The project involves minor upgrades to the current<br />
level of car float technology.<br />
Responsible Organizations/Action Plan<br />
To be determined – Resolve outstanding bi-state coordination issues and cross-harbor carrier<br />
issues.<br />
Action 2 – Complete Cross Harbor Tunnel and Ancillary Facilities DEIS<br />
Description<br />
The Cross Harbor Freight Movement DEIS being conducted by the NYCEDC includes an<br />
extensive analysis of future <strong>freight</strong> movement demand in the NYMTC region and an<br />
assessment of potential expansion of rail <strong>freight</strong> use resulting from the construction of a<br />
direct rail <strong>freight</strong> connection across the harbor. Though the DEIS has not been released at<br />
this writing, findings and methodology were made available to NYMTC for the purposes<br />
of this report. According to the DEIS, the Cross Harbor Tunnel investment program consists<br />
of three parts, as shown in Figure 5.7: 1) constructing a rail <strong>freight</strong> tunnel linking<br />
northern <strong>New</strong> Jersey and the East-of-Hudson region; 2) constructing an East-of-Hudson<br />
intermodal terminal to receive added rail traffic; and 3) making rail line improvements to<br />
support these facilities. Each part is described in detail below.<br />
1. Cross Harbor Rail Freight Tunnel Construction – A tunnel under the harbor would link<br />
the 65 th Street Yard in Brooklyn and the Greenville Yard in northern <strong>New</strong> Jersey. Single<br />
and double tunnel systems are under consideration. Each tunnel would contain<br />
one track. An alternative alignment across the north shore of Staten Island is<br />
expected to be ruled out in the DEIS.<br />
2. Maspeth Intermodal Terminal Construction – The proposed Maspeth terminal would be<br />
the hub for direct containerized intermodal service using a cross harbor tunnel. The<br />
terminal would handle traffic diverted to rail by new services made possible by the<br />
cross harbor rail tunnel. The Maspeth terminal would be connected to the tunnel via<br />
a two-track, <strong>freight</strong>-only route from the tunnel portal via the Bay Ridge and Montauk<br />
(west) Branches of the LIRR.<br />
Cambridge Systematics, Inc. 5-33