2008-2009 LR&TS Annual Report - Learning Resources Services ...
2008-2009 LR&TS Annual Report - Learning Resources Services ...
2008-2009 LR&TS Annual Report - Learning Resources Services ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Learning</strong> <strong>Resources</strong> & Technology <strong>Services</strong> – <strong>Annual</strong> <strong>Report</strong> FY09<br />
Networking<br />
Networking staff design, install and maintain campus data<br />
networks. The team provides wired and wireless networking<br />
services for the campus community and also establishes<br />
and maintains SCSU’s connection to the Internet.<br />
Summary of FY09 accomplishments<br />
Nearly 500 active Ethernet connections were added across<br />
campus, bringing the total ports in use to 8,443. Campus<br />
Internet bandwidth was increased from 120 Mbps to 180<br />
Mbps, with the capability to burst up to 250 Mbps; new<br />
equipment will need to be purchased and installed to<br />
accommodate this change, as the current Packetshaper can<br />
only handle 200 Mbps. New fiber optic cables were added<br />
to campus, and the network core router was moved to<br />
the new Centennial Hall data center. Additional 802.11n<br />
wireless access points were installed in three more areas<br />
of campus. Network services were extended to the Husky<br />
Hub and the new Richard Green House using pointto-point<br />
wireless systems. Network documentation was<br />
brought up-to-date.<br />
Other items of note:<br />
• Completed the Riverview and Brown Hall projects<br />
and began to work on Sycamore Place.<br />
• Planned for and consulted on the Fifth Avenue Live!,<br />
Administrative <strong>Services</strong> and National Hockey Center<br />
projects.<br />
• Discontinued dial-up for faculty, staff and emeriti on<br />
June 30, <strong>2009</strong>.<br />
Statistics:<br />
See Appendix CC<br />
FY09 Goals<br />
Implement plan to convert the network to a dual-core router design.<br />
• Added new fiber optics cables between Centennial<br />
Hall, Miller Center and Atwood. The primary core<br />
router moved to Centennial Hall, and the secondary<br />
core router was located to the Miller Center data center.<br />
Expand 802.11n wireless network pilot on campus.<br />
• Installed and piloted access points with 802.11n<br />
capabilities in the Public Safety Center, Garvey<br />
Commons and Ritsche Auditorium.<br />
• Disabled all of the 802.11n functions across campus<br />
after discovering connectivity and reliability issues.<br />
Introduce wireless point-to-point systems to extend network connectivity<br />
to areas of campus.<br />
• Installed point-to-point wireless systems to extend<br />
network services to the Husky Hub and the new<br />
Richard Green House.<br />
Revise the network diagram showing all network hardware and interconnectivity<br />
as recommended by the MnSCU security assessment.<br />
• Created and updated an SCSU network diagram<br />
using Microsoft Visio software.<br />
53