24.02.2015 Views

2008-2009 LR&TS Annual Report - Learning Resources Services ...

2008-2009 LR&TS Annual Report - Learning Resources Services ...

2008-2009 LR&TS Annual Report - Learning Resources Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Learning</strong> <strong>Resources</strong> & Technology <strong>Services</strong> – <strong>Annual</strong> <strong>Report</strong> FY09<br />

Networking<br />

Networking staff design, install and maintain campus data<br />

networks. The team provides wired and wireless networking<br />

services for the campus community and also establishes<br />

and maintains SCSU’s connection to the Internet.<br />

Summary of FY09 accomplishments<br />

Nearly 500 active Ethernet connections were added across<br />

campus, bringing the total ports in use to 8,443. Campus<br />

Internet bandwidth was increased from 120 Mbps to 180<br />

Mbps, with the capability to burst up to 250 Mbps; new<br />

equipment will need to be purchased and installed to<br />

accommodate this change, as the current Packetshaper can<br />

only handle 200 Mbps. New fiber optic cables were added<br />

to campus, and the network core router was moved to<br />

the new Centennial Hall data center. Additional 802.11n<br />

wireless access points were installed in three more areas<br />

of campus. Network services were extended to the Husky<br />

Hub and the new Richard Green House using pointto-point<br />

wireless systems. Network documentation was<br />

brought up-to-date.<br />

Other items of note:<br />

• Completed the Riverview and Brown Hall projects<br />

and began to work on Sycamore Place.<br />

• Planned for and consulted on the Fifth Avenue Live!,<br />

Administrative <strong>Services</strong> and National Hockey Center<br />

projects.<br />

• Discontinued dial-up for faculty, staff and emeriti on<br />

June 30, <strong>2009</strong>.<br />

Statistics:<br />

See Appendix CC<br />

FY09 Goals<br />

Implement plan to convert the network to a dual-core router design.<br />

• Added new fiber optics cables between Centennial<br />

Hall, Miller Center and Atwood. The primary core<br />

router moved to Centennial Hall, and the secondary<br />

core router was located to the Miller Center data center.<br />

Expand 802.11n wireless network pilot on campus.<br />

• Installed and piloted access points with 802.11n<br />

capabilities in the Public Safety Center, Garvey<br />

Commons and Ritsche Auditorium.<br />

• Disabled all of the 802.11n functions across campus<br />

after discovering connectivity and reliability issues.<br />

Introduce wireless point-to-point systems to extend network connectivity<br />

to areas of campus.<br />

• Installed point-to-point wireless systems to extend<br />

network services to the Husky Hub and the new<br />

Richard Green House.<br />

Revise the network diagram showing all network hardware and interconnectivity<br />

as recommended by the MnSCU security assessment.<br />

• Created and updated an SCSU network diagram<br />

using Microsoft Visio software.<br />

53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!