no objection in this regard. The rates quoted by tenderer shall be inclusive of all<br />

taxes, duties and other Govt. levies etc.<br />

25. The successful tenderer should give no claim certificate at the time of signing the<br />

final bill. The payment of the final bill as well as refund of security deposit will not<br />

be arranged till such certificate is given.<br />

26. Non compliance with any of the conditions set forth there in above is liable to<br />

result in the tender being rejected.<br />

27. The tender form is not transferable.<br />

28. The tenderer(s) shall inspect the proposed site of work and acquaint<br />

himself/themselves with the site conditions, working hours, layout of, land trees<br />

and shrubs that he/they will have to cut, type of strata likely to be met within the<br />

burrow pits, stacking space for materials, approach roads, path ways available,<br />

etc. and all relevant items connected with the execution of the work. No claim<br />

shall be entertained for the contractor (s) making his/their own arrangement for<br />

approaches/approach road from outside <strong>Railway</strong> land and contractor (s) will bear<br />

entire expenses such as road taxes, payment for right of way, etc. outsiders and<br />

for construction of approaches/approach roads etc.<br />

29. Drawings for the work can be seen in the offices of the Sr. Divisional Electrical<br />

Engineer, at any time during the office hours. These drawing are only for the<br />

guidance of contractors. Detailed working drawings (if required), based generally<br />

on the drawings mentioned above, will be given by the Engineer or his<br />

representative from time to time.<br />

30. All drawings copies of which may be furnished to the contractors by the <strong>Railway</strong><br />

Administration shall be treated as secret documents and should not be handed<br />

over or shown to the persons other than who are directly concerned with the<br />

work. The drawings shall be returned to the Engineer-in-charge on completion of<br />

the works or termination of the contract.<br />

31. The contractor shall take all steps necessary to ensure that all persons employed<br />

to any work in connection with this contract have noticed that the Indian officials<br />

secret act 1923 (XIV) of 1923 is applied to them and will continue to apply even<br />

after the execution of such work under the contract.<br />

************************************************<br />

[ Tenderer ] [ Page 13of 44 ] [For Sr.DEE/ADI ]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!