no objection in this regard. The rates quoted by tenderer shall be inclusive of all<br />
taxes, duties and other Govt. levies etc.<br />
25. The successful tenderer should give no claim certificate at the time of signing the<br />
final bill. The payment of the final bill as well as refund of security deposit will not<br />
be arranged till such certificate is given.<br />
26. Non compliance with any of the conditions set forth there in above is liable to<br />
result in the tender being rejected.<br />
27. The tender form is not transferable.<br />
28. The tenderer(s) shall inspect the proposed site of work and acquaint<br />
himself/themselves with the site conditions, working hours, layout of, land trees<br />
and shrubs that he/they will have to cut, type of strata likely to be met within the<br />
burrow pits, stacking space for materials, approach roads, path ways available,<br />
etc. and all relevant items connected with the execution of the work. No claim<br />
shall be entertained for the contractor (s) making his/their own arrangement for<br />
approaches/approach road from outside <strong>Railway</strong> land and contractor (s) will bear<br />
entire expenses such as road taxes, payment for right of way, etc. outsiders and<br />
for construction of approaches/approach roads etc.<br />
29. Drawings for the work can be seen in the offices of the Sr. Divisional Electrical<br />
Engineer, at any time during the office hours. These drawing are only for the<br />
guidance of contractors. Detailed working drawings (if required), based generally<br />
on the drawings mentioned above, will be given by the Engineer or his<br />
representative from time to time.<br />
30. All drawings copies of which may be furnished to the contractors by the <strong>Railway</strong><br />
Administration shall be treated as secret documents and should not be handed<br />
over or shown to the persons other than who are directly concerned with the<br />
work. The drawings shall be returned to the Engineer-in-charge on completion of<br />
the works or termination of the contract.<br />
31. The contractor shall take all steps necessary to ensure that all persons employed<br />
to any work in connection with this contract have noticed that the Indian officials<br />
secret act 1923 (XIV) of 1923 is applied to them and will continue to apply even<br />
after the execution of such work under the contract.<br />