[ii] The rate of recovery should be at the rate of 10% of the bill amount till the<br />

full security deposit is recovered<br />

[iii] Security Deposits will be recovered only from the running bills of the<br />

contract and no other mode of collecting SD such as SD in the form of<br />

instruments like BG, FD etc. shall be accepted towards Security Deposit.<br />

[iv] Security Deposit shall be returned to the contractor after completion of<br />

maintenance (guarantee) period as certified by the Competent Authority.<br />

The Competent Authority shall normally be the authority who is<br />

competent to sign the contract. If this Competent Authority is of the rank<br />

lower than JA Grade, then a JA grade officer (concerned with the work)<br />

should issue the certificate. The certificate, inter alia, should mention<br />

that the work has been completed in all respects and that all the<br />

contractual obligations have been fulfilled by the contractors and that<br />

there is no due from the contractor to <strong>Railway</strong>s against the contract<br />

concerned. Before realizing the SD, an unconditional and unequivocal<br />

no claim certificate from the contractor concerned should be obtained.<br />

12. Employment of Diploma and Degree Holder:<br />

The contractor shall employ the following technical staff during the execution of<br />

this work:<br />

[i] One graduate engineer when the cost of the work to be executed is ` 15<br />

lakhs and above.<br />

[ii] One qualified diploma holder when the cost of the work to be executed is<br />

more than ` 5 lakhs but less than ` 15 lakhs. Technical staff should be<br />

available at site whenever required by the Engineer in charge to take<br />

instruction. In case the contractor fails to employ the technical staff as said<br />

above, he shall be liable to pay a reasonable amount not exceeding a sum of<br />

` 2,000/ - (` Two - thousand only) for each month of default in case of<br />

graduate engineer and ` 1,000 /-(` One thousand - only) for each month of<br />

default in case of diploma holder as to the period for which the required<br />

technical staff was not employed by the contractor.<br />

13. Furnishing Wrong Information:<br />

If the tenderer/s deliberately gives / give wrong information in his / their tender,<br />

creates / create circumstances for the acceptance of his / their tender, the<br />

<strong>Railway</strong> administration reserve the right to reject such tender at any stage.<br />

14. <strong>Railway</strong> Administration Reserve The Rights:<br />

The <strong>Railway</strong> Administration reserves the right to change or amend the drawings<br />

as and when necessary at any stage of the work. No claim of any kind what so<br />

ever will be entertained by the <strong>Railway</strong>. In case the execution of any item of the<br />

work is held up for want of approved design or late supply of such material as are<br />

to be arranged by the <strong>Railway</strong>, then such failure or delay shall in no way effect or<br />

vitiate the contractor or alter the character thereof or entitle the contractor for<br />

damages or compensation thereof but in any such case, the <strong>Railway</strong> may grant<br />

such extension of the completion date as may be considered reasonable.<br />