[ii] The rate of recovery should be at the rate of 10% of the bill amount till the<br />
full security deposit is recovered<br />
[iii] Security Deposits will be recovered only from the running bills of the<br />
contract and no other mode of collecting SD such as SD in the form of<br />
instruments like BG, FD etc. shall be accepted towards Security Deposit.<br />
[iv] Security Deposit shall be returned to the contractor after completion of<br />
maintenance (guarantee) period as certified by the Competent Authority.<br />
The Competent Authority shall normally be the authority who is<br />
competent to sign the contract. If this Competent Authority is of the rank<br />
lower than JA Grade, then a JA grade officer (concerned with the work)<br />
should issue the certificate. The certificate, inter alia, should mention<br />
that the work has been completed in all respects and that all the<br />
contractual obligations have been fulfilled by the contractors and that<br />
there is no due from the contractor to <strong>Railway</strong>s against the contract<br />
concerned. Before realizing the SD, an unconditional and unequivocal<br />
no claim certificate from the contractor concerned should be obtained.<br />
12. Employment of Diploma and Degree Holder:<br />
The contractor shall employ the following technical staff during the execution of<br />
this work:<br />
[i] One graduate engineer when the cost of the work to be executed is ` 15<br />
lakhs and above.<br />
[ii] One qualified diploma holder when the cost of the work to be executed is<br />
more than ` 5 lakhs but less than ` 15 lakhs. Technical staff should be<br />
available at site whenever required by the Engineer in charge to take<br />
instruction. In case the contractor fails to employ the technical staff as said<br />
above, he shall be liable to pay a reasonable amount not exceeding a sum of<br />
` 2,000/ - (` Two - thousand only) for each month of default in case of<br />
graduate engineer and ` 1,000 /-(` One thousand - only) for each month of<br />
default in case of diploma holder as to the period for which the required<br />
technical staff was not employed by the contractor.<br />
13. Furnishing Wrong Information:<br />
If the tenderer/s deliberately gives / give wrong information in his / their tender,<br />
creates / create circumstances for the acceptance of his / their tender, the<br />
<strong>Railway</strong> administration reserve the right to reject such tender at any stage.<br />
14. <strong>Railway</strong> Administration Reserve The Rights:<br />
The <strong>Railway</strong> Administration reserves the right to change or amend the drawings<br />
as and when necessary at any stage of the work. No claim of any kind what so<br />
ever will be entertained by the <strong>Railway</strong>. In case the execution of any item of the<br />
work is held up for want of approved design or late supply of such material as are<br />
to be arranged by the <strong>Railway</strong>, then such failure or delay shall in no way effect or<br />
vitiate the contractor or alter the character thereof or entitle the contractor for<br />
damages or compensation thereof but in any such case, the <strong>Railway</strong> may grant<br />
such extension of the completion date as may be considered reasonable.<br />
[ Tenderer ] [ Page 20of 44 ] [For Sr.DEE/ADI ]