SPECIAL CONDITIONS OF <strong>TENDER</strong><br />

1. Regulations and abolition act 1970 and general rules 1971:<br />

[a] The contractor shall observe and follow all the provisions of the<br />

contractual labour regulations and abolition act 1970 and general rules<br />

1971 or any statutory modification or re enactment thereof for the time<br />

being in force and any rules and regulations made there under in respect<br />

of all the persons directly or through petty contractor or sub contractor<br />

employed by him under this contract indemnify the <strong>Railway</strong> from and<br />

against any claim under the contractual labour regulations and abolition<br />

act 1970 and general rules 1971 or any further rules and regulations<br />

framed there under by on or behalf of the person directly or through<br />

petty contractor or sub contractor employed him or otherwise.<br />

[b]<br />

The contractor shall obtain license from the licensing officers specified in<br />

the Act in necessary license fee as per section 12 of the Act 1970 and<br />

rules 26 of the General Rules 1971 in every case in which by virtue of<br />

section (20) (2) and 21 (4) of the central labour Regulations and abolitions<br />

Act 1970 the <strong>Railway</strong> is obligated to provide amenities of pay wages to<br />

labour employed by the contractor in executing the work, the <strong>Railway</strong> will<br />

recover from the contractor the expenditure so incurred by the <strong>Railway</strong> or<br />

the wages so paid and without prejudice to the rights of the <strong>Railway</strong> under<br />

section (2) (2) and 21 (4) of the said Act sub amounts of part there or by<br />

deducting it from the security deposit or from any such due by the<br />

<strong>Railway</strong> to the contractor whether under these or any other present<br />

provided that if any dispute arise as to the expenditure incurred by the<br />

<strong>Railway</strong> in the provision of the said amenities the decision of the Engineer<br />

there of shall be final and binding.<br />

2. Inspection:<br />

The <strong>Railway</strong>’s representative/ officers for checking the progress and quality of<br />

work could inspect the work site at any time. Any defects as may be noticed by<br />

the inspecting officials will have to be rectified by the contractor at his cost. In<br />

case the inspecting officer finds the progress unsatisfactory or the quality of work<br />

inferior, he may immediately order the contractor to suspend the work. The<br />

defects noticed should be got attended immediately, failing which the defects<br />

could be got rectified and the balance work got completed through any other<br />

agency at risk and cost of the defaulting contractor.<br />

3. Tools and plants:<br />

The contractor will have to make his own arrangements for tools and plants<br />

required for execution of the works.<br />

4. Works completion report:<br />

A work completion report will have to be given by the contractor after the work<br />

has been completed in all respects with information as specified in clause and<br />

before submitting his final bill.<br />

5. Variation in quantities of tender schedule:<br />

[ Tenderer ] [ Page 14of 44 ] [For Sr.DEE/ADI ]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!