SPECIAL CONDITIONS OF <strong>TENDER</strong><br />
1. Regulations and abolition act 1970 and general rules 1971:<br />
[a] The contractor shall observe and follow all the provisions of the<br />
contractual labour regulations and abolition act 1970 and general rules<br />
1971 or any statutory modification or re enactment thereof for the time<br />
being in force and any rules and regulations made there under in respect<br />
of all the persons directly or through petty contractor or sub contractor<br />
employed by him under this contract indemnify the <strong>Railway</strong> from and<br />
against any claim under the contractual labour regulations and abolition<br />
act 1970 and general rules 1971 or any further rules and regulations<br />
framed there under by on or behalf of the person directly or through<br />
petty contractor or sub contractor employed him or otherwise.<br />
[b]<br />
The contractor shall obtain license from the licensing officers specified in<br />
the Act in necessary license fee as per section 12 of the Act 1970 and<br />
rules 26 of the General Rules 1971 in every case in which by virtue of<br />
section (20) (2) and 21 (4) of the central labour Regulations and abolitions<br />
Act 1970 the <strong>Railway</strong> is obligated to provide amenities of pay wages to<br />
labour employed by the contractor in executing the work, the <strong>Railway</strong> will<br />
recover from the contractor the expenditure so incurred by the <strong>Railway</strong> or<br />
the wages so paid and without prejudice to the rights of the <strong>Railway</strong> under<br />
section (2) (2) and 21 (4) of the said Act sub amounts of part there or by<br />
deducting it from the security deposit or from any such due by the<br />
<strong>Railway</strong> to the contractor whether under these or any other present<br />
provided that if any dispute arise as to the expenditure incurred by the<br />
<strong>Railway</strong> in the provision of the said amenities the decision of the Engineer<br />
there of shall be final and binding.<br />
2. Inspection:<br />
The <strong>Railway</strong>’s representative/ officers for checking the progress and quality of<br />
work could inspect the work site at any time. Any defects as may be noticed by<br />
the inspecting officials will have to be rectified by the contractor at his cost. In<br />
case the inspecting officer finds the progress unsatisfactory or the quality of work<br />
inferior, he may immediately order the contractor to suspend the work. The<br />
defects noticed should be got attended immediately, failing which the defects<br />
could be got rectified and the balance work got completed through any other<br />
agency at risk and cost of the defaulting contractor.<br />
3. Tools and plants:<br />
The contractor will have to make his own arrangements for tools and plants<br />
required for execution of the works.<br />
4. Works completion report:<br />
A work completion report will have to be given by the contractor after the work<br />
has been completed in all respects with information as specified in clause and<br />
before submitting his final bill.<br />
5. Variation in quantities of tender schedule:<br />