12 hour Power backup of EMCS unit, GPRS, wiring and fixing arrangement, as<br />
required.<br />
2. Supply of device data generation device to ensure Dashboard view for monitoring and<br />
control of all Lights. With laser Jet printer (A-4 size paper) and a digital camera. (14.1<br />
Mega pixels) with all accessories.<br />
3. Miscellaneous installation material like cables, lugs and mounting clamps etc. required<br />
for installation of EMCS Units shall be in the scope of bidder.<br />
4. Care shall be taken for proper crimping / tightening of the lugs / clamps to avoid any<br />
overheating, damage / malfunctioning during normal operation of the system.<br />
5. Installation Checks and verification: On completion of the erection activity, a physical<br />
verification of the installation shall be carried out by the Bidder’s supervisor /<br />
technician under the vigilance of RAILWAYS officials.<br />
6. The proposed EMCS system should be hosted at a Central Data Centre minimum Tier<br />
3 data center and should be in operation for a minimum of 2 years and the system must<br />
be web based. The EMCS application software should be accessible through a web<br />
browser via Internet. There should not be any requirement of client license on the User<br />
workstation.<br />
7. Integrating this system with existing centralized monitoring system of rake arrival and<br />
departure automation for washing platform lighting at Ahmedabad (BG).<br />
2. Functional Requirements<br />
2. 1 Hardware Functional Requirements:<br />
1. EMCS devices installed at RAILWAYS premises should send the data at regular<br />
intervals of 15 minutes over GPRS mode of communication to the Data Collection<br />
Servers at Bidders Data Centre.<br />
2. The parent EMCS device should communicate on GPRS and should send the energy<br />
data without any command / polling from the data centre<br />
3. Display of Electrical Parameters and Device connection status on local display of each<br />
device.<br />
4. The data sent by the EMCS should have real time stamping.<br />
5. The Real Time Clock (RTC) of all the EMCS Unit should be remotely synchronized to<br />
the Central Server using the Web Based Application Software.<br />
6. The EMCS Unit should have power backup of at least 12 hours for running the EMCS<br />
unit, in case of power failure.<br />