Cable route markers shall be provided along straight runs of the cables at the locations<br />

approved by <strong>Railway</strong>.<br />

Route markers shall be made out as per sketch with information as size, cores and<br />

grade of cable shall be displayed. Cable route indicators with IR engraved on it to be<br />

provided at every 50 meters.<br />

Jointing:<br />

Before jointing is commenced all safety precautions like isolation, discharging, earthing<br />

etc. shall be taken to ensure that the cable would not be in-advertantly charged from live<br />

supply. Metallic armour and external metallic bonding shall be connected to earth.<br />

Where cable is to be jointed with the existing cable the sequence should be so arranged,<br />

as to avoid crossing of cores while jointing.<br />

Note: For item no. 6 of SCHEDULE, digging and laying of cable to be done in garden<br />

area where trench should be taken 1 feet deep and filling back without bricks. Contractor<br />

shall have to repair plaster or bricks work if damaged<br />

(J) Technical specification for item No. 12 of SCHEDULE of rates and quantities:<br />

[Laying of cable in Air, Wall, Pipe etc]<br />

Cable shall be laid between poles and main boards. These cables are to be laid on wall /<br />

Pole / Air with suitable of clamps.<br />

Route of the cable.<br />

Before laying is under taken the route shall be marked in consultation with <strong>Railway</strong>'s<br />

representative at site.<br />

Jointing:<br />

Before jointing is commenced all safety precautions like isolation, discharging, earthing<br />

etc. shall be taken to ensure that the cable would not be in-advertantly charged from live<br />

supply. Where cable is to be jointed with the existing cable the sequence should be so<br />

arranged, as to avoid crossing of cores while jointing.<br />

The installation of cable including joints shall be carried out in accordance with code of<br />

practice as specified in relevant ISS as amended latest.<br />

(K) Technical specification for item no.13 of SCHEDULE of rate and quantities :<br />

[ Laying of cable in RCC area]<br />

The Contractor shall have to do laying of the existing cables in trench in the size of<br />

300mmx200 mm and laying of existing cable in same trench & resurfacing as earlier.<br />

The Digging of the trench should be carried out by excavation method in<br />

PCC/Road/Platform area.<br />

Contractor shall have to made trench by excavation method in pukka<br />

(PCC/Road/Platform) area. Digging of trench and it’s covering with PCC to be done by<br />

contractor. Filling of this trench shall be done with PCC having ratio of cement<br />

concrete and sand as per 1:2:4 ratio. Work shall be carrying out as per instruction of<br />

site in charge.<br />

-----------------------------<br />

[ Tenderer ] [ Page 43of 44 ] [For Sr.DEE/ADI ]