TECHNICAL SPECIFICATION<br />
Name of Work:<br />
Ahmedabad (BG) : Electrical work in connection with repair to catwalk for<br />
washing cum inspection pit lines.<br />
SCOPE OF WORK:<br />
This work " Ahmedabad (BG) : Electrical work in connection with repair to catwalk<br />
for washing cum inspection pit lines.” Includes SITC of DB, LED light fittings,<br />
portal, Digging of cable trench and laying of cable, Laying of cable in air, wall and in<br />
existing structure, laying of cable in RCC structure, supply of LT XLPE cable, casting of<br />
foundation, gounting and muffing etc.<br />
Terms & Conditions [Specific to work]:<br />
A. The contractor shall carry out the electrical work as per IE Rules & Regulation<br />
and specification. Relevant IS specifications wherever applicable shall be<br />
followed.<br />
B. In case of any ambiguity in technical specifications of the work, the matter shall<br />
be referred to Sr. DEE and his decision shall be binding on contractor.<br />
C. The contractor has to supply & provide ancillary materials such as nut, bolt,<br />
clamps, brackets etc required for the work even if they are not mentioned in the<br />
tender schedule.<br />
D. The materials used in the work shall be of the standard make and shall be got<br />
approved from officer in charge of execution of work i.e. ADEE / P/ ADI before its<br />
installation.<br />
E. The unit rate in the rate schedule includes supply, installation, testing, &<br />
commissioning including all contingent material like hard ware, bushes, PVC<br />
flexible pipe, down rods, chain, clamps, connecting wires etc. if not specified in<br />
the rates schedule.<br />
F. Electrical works shall be carried out by the contractor in supervision of the railway<br />
Engineers and contractor shall inform the railway representative before starting<br />
the work. All the hidden work i.e laying of cables etc. shall be carried out in the<br />
presence of railway supervisor / representative.<br />
G. The released material to be collected and deposited in Rlys supervisor stores by<br />
contractor by deploying his own manpower and transport. The released material<br />
should be accounted for by Rly’s supervisor and contractor with joint note.<br />
H. Earth excavation should be carried out very cautiously so that<br />
Electrical/Telecommunication/Signaling cable passing through underground<br />
enroute the rail periphery do not get damage. if any damaged caused to<br />
OFC/Quad cable or Electrical cable during execution of the work, necessary<br />
debit shall be raised.<br />