TECHNICAL SPECIFICATION<br />

Name of Work:<br />

Ahmedabad (BG) : Electrical work in connection with repair to catwalk for<br />

washing cum inspection pit lines.<br />

SCOPE OF WORK:<br />

This work " Ahmedabad (BG) : Electrical work in connection with repair to catwalk<br />

for washing cum inspection pit lines.” Includes SITC of DB, LED light fittings,<br />

portal, Digging of cable trench and laying of cable, Laying of cable in air, wall and in<br />

existing structure, laying of cable in RCC structure, supply of LT XLPE cable, casting of<br />

foundation, gounting and muffing etc.<br />

Terms & Conditions [Specific to work]:<br />

A. The contractor shall carry out the electrical work as per IE Rules & Regulation<br />

and specification. Relevant IS specifications wherever applicable shall be<br />

followed.<br />

B. In case of any ambiguity in technical specifications of the work, the matter shall<br />

be referred to Sr. DEE and his decision shall be binding on contractor.<br />

C. The contractor has to supply & provide ancillary materials such as nut, bolt,<br />

clamps, brackets etc required for the work even if they are not mentioned in the<br />

tender schedule.<br />

D. The materials used in the work shall be of the standard make and shall be got<br />

approved from officer in charge of execution of work i.e. ADEE / P/ ADI before its<br />

installation.<br />

E. The unit rate in the rate schedule includes supply, installation, testing, &<br />

commissioning including all contingent material like hard ware, bushes, PVC<br />

flexible pipe, down rods, chain, clamps, connecting wires etc. if not specified in<br />

the rates schedule.<br />

F. Electrical works shall be carried out by the contractor in supervision of the railway<br />

Engineers and contractor shall inform the railway representative before starting<br />

the work. All the hidden work i.e laying of cables etc. shall be carried out in the<br />

presence of railway supervisor / representative.<br />

G. The released material to be collected and deposited in Rlys supervisor stores by<br />

contractor by deploying his own manpower and transport. The released material<br />

should be accounted for by Rly’s supervisor and contractor with joint note.<br />

H. Earth excavation should be carried out very cautiously so that<br />

Electrical/Telecommunication/Signaling cable passing through underground<br />

enroute the rail periphery do not get damage. if any damaged caused to<br />

OFC/Quad cable or Electrical cable during execution of the work, necessary<br />

debit shall be raised.<br />