24.02.2015 Views

AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway

AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway

AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

[Downloaded from Internet]<br />

NOTE:-<br />

(i)<br />

(ii)<br />

80% of supply rates will be paid against supply, inspection and<br />

acceptance of materials.<br />

20% of supply rates and 100% of installation charges will be paid after<br />

successful installation, testing and commissioning.<br />

‣ As per the FA & CAO’s latter no. HQ/Bks/CPC/Misc.Corresp/Vol II, dated<br />

02/07/2010, Reserve Bank of India will stop the practice of honouring<br />

cheques issued by <strong>Railway</strong>s on their outstation accounts with RBI from<br />

31.08.2010.<br />

‣ All the payments to the contractors, suppliers, etc are to be made only in<br />

Electronic modes (NEFT/RTGS).<br />

‣ The Contractors who do not have an Account in NEFT/RTGS enabled<br />

bank branches may shift their account to NEFT/RTGS enabled bank<br />

branches. (List of such bank branches is available at RBI’s website<br />

www.rbi.org.in/scripts/neft.aspx ).<br />

‣ Tenderers should provide the details of bank name, branch name and<br />

address, Account type, Bank account no. and bank and branch code as<br />

appearing in the MICR cheque issued by the bank. The Tenderer should<br />

also attach certificate from their bank certifying the correctness of all the<br />

above mentioned information.<br />

‣ The tenderer for carrying out any construction work in Gujarat must get<br />

themselves registered from the Registering Officer under Section – 7 of<br />

the Building and Other Construction Workers Act,1996 and rules made<br />

thereto by the Gujarat Govt and submit certificate of Registration issued<br />

from The Registering Officer of the Gujarat govt. Labour Deptt. For<br />

enactment of this ACT, the tenderer shall required to pay cess@1 % of<br />

cost of construction work to be deducted from each bill. Cost of material<br />

shall be outside the purview of cess, when supplied under a separate<br />

schedule item.<br />

10. Performance Guarantee [PG]:<br />

Clause of Performance Guarantee has been modified in GCC in term's of<br />

<strong>Railway</strong> board's letter No.2007/CE-I/CT/18 Pt,XII dated 31.12.2010.<br />

The procedure for obtaining Performance Guarantee is outlined below:<br />

a) The successful bidder shall have to submit a Performance Guarantee (PG)<br />

within 30 (thirty) days from the date of issue of Letter Of Acceptance (LOA).<br />

Extension of time for submission of PG beyond 30 (thirty) days and up to 60<br />

days from the date of issue of LOA may be given by the Authority who is<br />

competent to sign the contract agreement. However, a penal interest of 15%<br />

per annum shall be charged for the delay beyond 30 (thirty) days, i.e. from<br />

31 st day after the date of issue of LOA. In case the contractor fails to submit<br />

the requisite PG even after 60 days from the date of issue of LOA, the<br />

contract shall be terminated duly forfeiting EMDand other dues, if any<br />

payable against that contract. The failed contractor shall be debarred from<br />

participating in re-tender for that work.<br />

[ Tenderer ] [ Page 17of 44 ] [For Sr.DEE/ADI ]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!