AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway
AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway
AHMEDABAD DIVISION TENDER DOCUMENT ... - Western Railway
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
[Downloaded from Internet]<br />
5.0 Energy Management services:<br />
Firm should be doing online energy audit based on the continuous reports being<br />
generated through the system with the help of energy auditor and submitting reports on<br />
quarterly basis for two years covering following points<br />
1. Previous 3 month analysis of energy management reports generated from web based<br />
energy management system<br />
2. Running hours to be decided based on average requirement.<br />
3. Suggestion for any addition/ modification in alert and alarm requirement for <strong>Railway</strong>s.<br />
4. Suggesting for changes in auto control facility for <strong>Railway</strong>s.<br />
5. Submitting printout of one original and 2 duplicate copy<br />
6.0 Inspection of material<br />
6.1 For inspecting the major/high value items, <strong>Railway</strong>’s representative will visit to<br />
manufacturer’s premises to conduct the test. Contractor shall provide all necessary<br />
assistance in carrying out below mentioned test and inspection at his own cost.<br />
A. Software features:-<br />
a) Web based report generation of all the function requirement of software as per<br />
specification<br />
b) Rule based control in form of SMS/ Email/ Alarm/ ON/ OFF action.<br />
c) Web/ SMS based control of pumps<br />
d) SMS based feedback in case alert or alarm generation to assigned person of <strong>Railway</strong>s<br />
in case<br />
1. On-Off<br />
2. Door open<br />
3. No Input supply<br />
4. Light failed to operate (on/off)<br />
5. Crossing bench mark figure of each parameter<br />
e) Dashboard view feature<br />
f) Group data report and modification<br />
g) Controlling of light minimum from 5 KMS distance and<br />
i) Access possibility minimum from 5 places.<br />
B. Hardware features:-<br />
1. High voltage protection tripping<br />
2. Protection against short circuit protection<br />
3. Protection against single phase phasing.<br />
4. Protection against neutral missing, phase to phase shorting<br />
[ Tenderer ] [ Page 39of 44 ] [For Sr.DEE/ADI ]