30.03.2015 Views

Engine Titanium Consortium - Center for Nondestructive Evaluation ...

Engine Titanium Consortium - Center for Nondestructive Evaluation ...

Engine Titanium Consortium - Center for Nondestructive Evaluation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

incorporating the results of the previously described major work elements. For example,<br />

procedures will be specified <strong>for</strong> the determination of the signal and noise distributions, defining the<br />

relative roles of empirical data and physical models. A final <strong>for</strong>m of the methodology will be<br />

produced, including software incorporating all experiences gained in the execution of the subtask.<br />

This will be transferred to the OEMs and documented in a final report.<br />

Objective/Approach Amendments: Objective and approach remain as originally proposed in July<br />

1998.<br />

Progress (January 1, 2002 – March 31, 2002):<br />

On March 16, 2000 the FAA issued instructions to end all expenditures on Task 3, other than those<br />

associated with the RDB technical plan, with a restart to be considered once the sources of the<br />

discrepancy had been resolved. On March 14, 2001, the FAA has indicated that work is to be<br />

resumed on sub-tasks 3.1.1 and 3.1.2, but discussions have not yet been held regarding the restart<br />

of Task 3.1.3.<br />

Plans (April 1, 2002 – June 30, 2002):<br />

At the present time, no activity is planned <strong>for</strong> this period.<br />

Milestones:<br />

Revised dates of TBD are shown <strong>for</strong> most of the tasks, given that work has been stopped while the<br />

problems with the random defect block are being addressed.<br />

Original<br />

Date<br />

Revised<br />

Date<br />

Description<br />

Status<br />

Workshop and Implementation Plan<br />

6 months TBD Establish implementation plan <strong>for</strong> adaptation of the<br />

methodology to eddy current inspection. Define<br />

data needed by Inspection Systems Capability<br />

Working Group to generate POD/PFA estimates<br />

and provide guidance to Inservice Inspection<br />

working group. (All)<br />

18 months TBD Application to a Simple Geometry: Flat Plates<br />

24 months TBD Development of Key Additional Ingredients <strong>for</strong> POD<br />

Modeling<br />

Application to a Complex Geometry: Blade Slots<br />

Improvement/Transfer of the POD/PFA<br />

Methodology Software to the OEMs<br />

Deliverables:<br />

Validated POD/PFA methodology <strong>for</strong> ET inspection based on signal and noise distributions which<br />

incorporates false call considerations, can be applied to sparse data and can predict the results of<br />

similar inspections <strong>for</strong> which no data is available.<br />

Quarterly Report – January 1, 2002 –March 31, 2002<br />

print date/time: 6/6/2002 - 8:39 AM – Page 110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!