Engine Titanium Consortium - Center for Nondestructive Evaluation ...
Engine Titanium Consortium - Center for Nondestructive Evaluation ...
Engine Titanium Consortium - Center for Nondestructive Evaluation ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5 MHz C-scan Image Comparisons: B1AW2-B<br />
Side 2<br />
Model Experiment Model<br />
Side 4<br />
Experiment<br />
31(H) x 31(V) @10 mils, 2dB<br />
peak amplitude @2dB=573 mv<br />
deviation=155% or 8.1 dB<br />
60(H) x 30(V) @10 mils, 2dB<br />
peak amplitude @2dB=225 mv<br />
51(H) x 31(V) @10 mils, 0dB<br />
peak amplitude @0dB=901 mv<br />
deviation=474% or 15.2 dB<br />
60(H) x 30(V) @10 mils, 0dB<br />
peak amplitude @0dB=157 mv<br />
Model<br />
Side 5<br />
Experiment<br />
Model<br />
Side 6<br />
Experiment<br />
31(H) x 31(V) @10 mils, 2dB<br />
peak amplitude @2dB=111 mv<br />
deviation=-49% or -5.8 dB<br />
60(H) x 30(V) @10 mils, 2dB<br />
peak amplitude @2dB=217 mv<br />
31(H) x 31(V) @10 mils, 0dB<br />
peak amplitude @0dB=192 mv<br />
deviation=-51% or -6.1 dB<br />
60(H) x 30(V) @10 mils, 0dB<br />
peak amplitude @0dB=384 mv<br />
Multizone Color Code<br />
0 128 255<br />
Experiment 255 = 500mv <strong>for</strong> sides 2, 5 and 6<br />
= 250mv <strong>for</strong> side 4<br />
Plans (April 1, 2002 – June 30, 2002):<br />
Figure 5. 5 MHz C-scan Image Comparisons: B1AW2-B<br />
Primary plans <strong>for</strong> this period are to complete the analysis of the CBS data. Assuming approval of<br />
the restart technical plan by the FAA, technical work will resume as directed by the agency.<br />
Milestones:<br />
Revised dates of TBD are shown <strong>for</strong> most of the tasks, given that work has been stopped while the<br />
problems with the random defect block are being addressed. Revised dates to be provided in next<br />
report.<br />
Original<br />
Revised<br />
Description<br />
Status<br />
Date<br />
Date<br />
Approach to tune flaw response model to the<br />
behavior of naturally occurring flaws<br />
4 months TBD Provide a written description of the recommended<br />
method (GE, ISU)<br />
6 months TBD A report defining a method <strong>for</strong> relating properties of<br />
naturally-occurring flaws to the parameters of the<br />
ISU model.<br />
12 month deliverable of 3.1.2 is<br />
serving as a common basis <strong>for</strong> 3.1.1,<br />
3.1.2. General procedure <strong>for</strong> tuning<br />
flaw response model is included in<br />
the 3.1.2 white-paper.<br />
Completion of full report delayed by<br />
redirection of work.<br />
Improvements and assessment of POD/PFA<br />
Quarterly Report – January 1, 2002 –March 31, 2002<br />
print date/time: 6/6/2002 - 8:39 AM – Page 93