Original<br />

Revised<br />

Description<br />

Status<br />

Date<br />

Date<br />

POD <strong>for</strong> nickel billet<br />

24 months Initiate nickel billet POD program utilizing results<br />

from Production Inspection Task. (ISU, with<br />

support from AE, GE, PW)<br />

30 months Characterize transducers to be used in inspection<br />

of nickel billets. (Utilize results from 1.1.2)<br />

58 months Predict response <strong>for</strong> nickel billets. Use calibration<br />

standards and chord blocks <strong>for</strong> validation as<br />

appropriate. (ISU with support from AE, GE, PW)<br />

60 months Provide report of POD estimates <strong>for</strong> nickel billet.<br />

(ISU with support from AE, GE, PW)<br />

Compare results with those from alternative POD<br />

methodologies. (GE, with support from ISU)<br />

60 months Report documenting the POD and PFA estimates<br />

<strong>for</strong> nickel billet, including comparison with POD<br />

results from existent methodologies.<br />

(8/97 -<br />

Phase I<br />

(12/97 -<br />

Phase I)<br />

(4/98 -<br />

Phase I)<br />

(8/98 -<br />

Phase I)<br />

Program<br />

start<br />

6/15/99<br />

Comparison of inspection systems - Use of the<br />

Random Defect Block<br />

Random defect block fabrication completed.<br />

ISU predictions of accuracy of model completed.<br />

Initiate ETC measurements using zoned and<br />

conventional inspection (on commercial systems.<br />

Complete measurements on RDB. (GE)<br />

Begin data analysis of ETC measurements on<br />

random defect block. (All)<br />

5/8/00<br />

1/8/01<br />

Begin random defect block recovery program.<br />

Complete random defect block recovery program.<br />

6 months TBD Incorporate interim results into provision of<br />

improved default POD curves to RISC and TRMD.<br />

(GE, PW, with support of AE)<br />

38 months Provide report comparing conventional and zoned<br />

inspection systems in use by billet suppliers, based<br />

on data from the Random Defect Block. (All)<br />

40 months A report documenting the relative effectiveness of<br />

conventional and Multizone systems <strong>for</strong> the<br />

ultrasonic inspection of billet.<br />

Completed. Ef<strong>for</strong>t initiated at<br />

program start in June 1999<br />

Completed<br />

Expect delay resulting from RDB<br />

issues.<br />

Deliverables:<br />

A report defining a method <strong>for</strong> relating properties of naturally-occurring flaws to the parameters of<br />

the ISU model.<br />

A report assessing success of the Phase I development of a new POD methodology.<br />

Software and material characterization procedures with which the OEMs can implement the new<br />

methodology.<br />

Quarterly Report – January 1, 2002 –March 31, 2002<br />

print date/time: 6/6/2002 - 8:39 AM – Page 95