Original<br />
Revised<br />
Description<br />
Status<br />
Date<br />
Date<br />
POD <strong>for</strong> nickel billet<br />
24 months Initiate nickel billet POD program utilizing results<br />
from Production Inspection Task. (ISU, with<br />
support from AE, GE, PW)<br />
30 months Characterize transducers to be used in inspection<br />
of nickel billets. (Utilize results from 1.1.2)<br />
58 months Predict response <strong>for</strong> nickel billets. Use calibration<br />
standards and chord blocks <strong>for</strong> validation as<br />
appropriate. (ISU with support from AE, GE, PW)<br />
60 months Provide report of POD estimates <strong>for</strong> nickel billet.<br />
(ISU with support from AE, GE, PW)<br />
Compare results with those from alternative POD<br />
methodologies. (GE, with support from ISU)<br />
60 months Report documenting the POD and PFA estimates<br />
<strong>for</strong> nickel billet, including comparison with POD<br />
results from existent methodologies.<br />
(8/97 -<br />
Phase I<br />
(12/97 -<br />
Phase I)<br />
(4/98 -<br />
Phase I)<br />
(8/98 -<br />
Phase I)<br />
Program<br />
start<br />
6/15/99<br />
Comparison of inspection systems - Use of the<br />
Random Defect Block<br />
Random defect block fabrication completed.<br />
ISU predictions of accuracy of model completed.<br />
Initiate ETC measurements using zoned and<br />
conventional inspection (on commercial systems.<br />
Complete measurements on RDB. (GE)<br />
Begin data analysis of ETC measurements on<br />
random defect block. (All)<br />
5/8/00<br />
1/8/01<br />
Begin random defect block recovery program.<br />
Complete random defect block recovery program.<br />
6 months TBD Incorporate interim results into provision of<br />
improved default POD curves to RISC and TRMD.<br />
(GE, PW, with support of AE)<br />
38 months Provide report comparing conventional and zoned<br />
inspection systems in use by billet suppliers, based<br />
on data from the Random Defect Block. (All)<br />
40 months A report documenting the relative effectiveness of<br />
conventional and Multizone systems <strong>for</strong> the<br />
ultrasonic inspection of billet.<br />
Completed. Ef<strong>for</strong>t initiated at<br />
program start in June 1999<br />
Completed<br />
Expect delay resulting from RDB<br />
issues.<br />
Deliverables:<br />
A report defining a method <strong>for</strong> relating properties of naturally-occurring flaws to the parameters of<br />
the ISU model.<br />
A report assessing success of the Phase I development of a new POD methodology.<br />
Software and material characterization procedures with which the OEMs can implement the new<br />
methodology.<br />
Quarterly Report – January 1, 2002 –March 31, 2002<br />
print date/time: 6/6/2002 - 8:39 AM – Page 95