(UO, US, UM, UH) were machined, and were inspected ultrasonically (see figure 16 <strong>for</strong><br />

identification of faces). Then the remaining faces were machined, with the exception of the bore<br />

UZ, since the piece will be delivered with a solid bore.<br />

Figure 16. Configuration and face identification of the synthetic inclusion <strong>for</strong>ging.<br />

Plans (April 1, 2002 – June 30, 2002):<br />

Property Measurements Continue ef<strong>for</strong>ts to relate grain noise variations within <strong>for</strong>gings to <strong>for</strong>ging<br />

strain variations as predicted using DEFORM.<br />

Noise Curvature Blocks: Per<strong>for</strong>m grain noise measurements through the curved surfaces of the<br />

blocks. Compare RMS and gated-peak noise statistics, corrected <strong>for</strong> microstructural differences to<br />

the predictions of the ISU model.<br />

Synthetic Inclusion Disk: The remaining faces of the machined <strong>for</strong>ging will be inspected<br />

ultrasonically. The data will be analyzed to verify that the noise levels and noise distributions make<br />

it a suitable piece <strong>for</strong> the synthetic inclusion <strong>for</strong>ging. It will then be delivered to GE CR&D <strong>for</strong><br />

continued machining into its final <strong>for</strong>m.<br />

Milestones:<br />

Original<br />

Date<br />

Revised<br />

Date<br />

Description<br />

Status<br />

Flaw and sample definition<br />

3 months Generate critical flaw list <strong>for</strong> titanium <strong>for</strong>gings in<br />

cooperation with RISC and provide to 3.1.2. (All)<br />

4 months Utilize de<strong>for</strong>mation model predictions to guide<br />

sample development. (PW with support from ISU)<br />

6 months 11 months Provide list of samples and sample geometry to be<br />

developed <strong>for</strong> <strong>for</strong>ging property measurements.<br />

(ISU with support from GE, PW)<br />

Complete<br />

Complete<br />

Complete<br />

Quarterly Report – January 1, 2002 –March 31, 2002<br />

print date/time: 6/6/2002 - 8:39 AM – Page 51