Description<br />

Status<br />

34 months Design and build two transducers <strong>for</strong> 14” diameter<br />

center zone. Evaluate per<strong>for</strong>mance on 14” chord<br />

block. (PW with support from GE)<br />

(30<br />

months)<br />

(33<br />

months)<br />

(39<br />

months)<br />

(42<br />

months)<br />

(48<br />

months)<br />

10” diameter phased array,(go/no go decision<br />

at 30 months)<br />

(Critical review with FAA, seek program redirection<br />

to develop phased arrays) (All)<br />

Complete preliminary phased array surveys. (PW)<br />

Evaluate up to three candidate phased array<br />

systems.<br />

Identify preferred configuration <strong>for</strong> factory<br />

evaluation system.<br />

Design and build improved phased array<br />

transducer assembly.<br />

Factory <strong>Evaluation</strong> / Demonstration<br />

36 months* 44 months Complete factory test of five heats. Conduct<br />

industry demonstration of #1FBH capability in 10”<br />

diameter. (GE, PW)<br />

38 months* 46 months Evaluate indication finds from factory test,<br />

document results. (GE, PW, ISU).<br />

40 months 48 months Report of laboratory and factory evaluations<br />

including sensitivity data <strong>for</strong> use by the Inspection<br />

Systems Capability Working Group and cost<br />

comparisons <strong>for</strong> the different inspection<br />

approaches. (All)<br />

Large diameter billet<br />

12 months Build chord calibration standard <strong>for</strong> 14” diameter,<br />

near-center region. (PW)<br />

18 months 20 months Evaluate capability on 13” and 14” diameter using<br />

conventional and zoned fixed focus, determine<br />

improvement over conventional. Provide data to<br />

3.1.1 <strong>for</strong> model validation and POD estimation <strong>for</strong><br />

large diameter billet. (GE, PW, ISU)<br />

20 months 24 months Laboratory assessment of sensitivity at diameters<br />

greater than 10" diameter using fixed focus<br />

transducers. (All)<br />

General issues<br />

28 months Complete attenuation compensation procedure in<br />

cooperation with 3.1.1. (ISU with support from PW<br />

and GE)<br />

30 months Procedures to account <strong>for</strong> attenuation effects that<br />

occur in titanium billet and thus improve the POD of<br />

billet inspection. (All)<br />

Original<br />

Date<br />

Revised<br />

Date<br />

Description<br />

Transducer order has been placed.<br />

Complete<br />

13” billet inspection complete at GE<br />

14” chord block inspection complete<br />

Complete at P&W<br />

Status<br />

60 months Provide revision of AMS 2628 titanium billet<br />

specification to SAE Committee K.<br />

60 months Calibration standards including 14" diameter chord<br />

block and transducers (fixed focus and phased<br />

array assemblies) as needed.<br />

Quarterly Report – January 1, 2002 –March 31, 2002<br />

print date/time: 6/6/2002 - 8:39 AM – Page 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!