Plans (April 1, 2002 – June 30, 2002):<br />

Begin inspection of Inconel and Waspaloy billet with Multizone as part of the pilot lot.<br />

Start metallographic sectioning of indications identified in the pilot inspection.<br />

Milestones:<br />

Original<br />

Date<br />

Revised<br />

Date<br />

Description<br />

Nickel billet inspection development<br />

3 months Kickoff meeting to verify selection of materials and<br />

target sensitivities, initiate design of calibration<br />

standards and establish metrics <strong>for</strong> cost and<br />

sensitivity assessment. Coordination with<br />

Inspection Systems Capability Working Group will<br />

occur to ensure necessary data <strong>for</strong> later POD<br />

studies. (All)<br />

24 months Assessment of sensitivity <strong>for</strong> small diameter billet.<br />

Data to be provided to Task 3.1 to enable POD<br />

assessment. (HW)<br />

24 months Complete modeling and laboratory testing of<br />

existing transducers on calibration standards <strong>for</strong><br />

INCO718 and assess need <strong>for</strong> new transducers.<br />

(GE, ISU).<br />

24 months Complete modeling and laboratory testing of<br />

existing transducers on calibration standards <strong>for</strong><br />

Waspaloy and assess need <strong>for</strong> new transducers.<br />

(PW, ISU)<br />

Status<br />

Complete<br />

Complete<br />

18 months Complete calibration standards. (GE, PW) Complete<br />

22 months Assessment of conventional inspections <strong>for</strong><br />

baseline. (GE, PW). Data to be provided to Task<br />

3.1 to enable POD assessment. (All)<br />

24 months 30 months Complete logistics of pilot lot inspection including<br />

establishing agreements with multizone inspection<br />

source and billet suppliers and establishing means<br />

of acquiring necessary cost data. (GE, PW)<br />

30 months Per<strong>for</strong>m laboratory demonstration <strong>for</strong> ETC<br />

members. (GE, PW)<br />

36 months Complete factory evaluation of approximately<br />

100,000 pounds of billet. Per<strong>for</strong>m demonstration<br />

<strong>for</strong> OEMs and industry at inspection facility. (GE,<br />

PW, ISU)<br />

38 months Evaluate any finds to determine necessary size<br />

parameters <strong>for</strong> POD assessment. (GE, ISU, PW)<br />

42 months Complete cost comparison of higher sensitivity<br />

multiple zone inspection with conventional<br />

inspection. (GE, PW)<br />

55 months Complete final report including sensitivity and cost<br />

comparison assessments. (All)<br />

55 months Report of laboratory and factory evaluations<br />

including sensitivity data <strong>for</strong> use by the Inspection<br />

Systems Capability Working Group and cost<br />

assessments. Calibration standards and fixed focus<br />

transducers.<br />

Complete – new transducers not<br />

needed to meet program goal<br />

Complete – new transducers not<br />

needed to meet program goal<br />

Complete<br />

PIA is in place. Logistics planning is<br />

proceeding<br />

Complete<br />

Quarterly Report – January 1, 2002 –March 31, 2002<br />

print date/time: 6/6/2002 - 8:39 AM – Page 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!