29.04.2015 Views

Eastern Contra Costa Transit Authority Contract ... - Tri Delta Transit

Eastern Contra Costa Transit Authority Contract ... - Tri Delta Transit

Eastern Contra Costa Transit Authority Contract ... - Tri Delta Transit

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Risk of Loss<br />

All loss or damage arising from any unforeseen obstruction or difficulties, either natural or<br />

artificial, which may be encountered in the furnishing of the supplies, materials, or equipment, or<br />

from any action of the elements prior to final written acceptance of the supplies, materials or<br />

equipment, or from any act or omission not authorized by the contract documents on the part of<br />

the contractor or any agent or person employed by it, shall be sustained and borne solely by the<br />

contractor.<br />

Addenda<br />

Each proposal shall include specific acknowledgment (in the space provided) of the receipt of all<br />

addenda issued during the bidding period. Failure to so acknowledge all addenda may result in<br />

the proposal being rejected as nonresponsive.<br />

Taxes<br />

Proposal prices shall include all applicable federal, state, and local taxes.<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!