16.11.2012 Views

Improvement of Material Flow in the Production and Supply Chain of ...

Improvement of Material Flow in the Production and Supply Chain of ...

Improvement of Material Flow in the Production and Supply Chain of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

process<strong>in</strong>g <strong>in</strong> station 5b. In <strong>the</strong> real production, preassembly l<strong>in</strong>e <strong>and</strong> f<strong>in</strong>al assembly<br />

l<strong>in</strong>e operate <strong>in</strong>dependently. At <strong>the</strong> end <strong>of</strong> preassembly l<strong>in</strong>e <strong>the</strong>re is an area used to<br />

deposit <strong>the</strong> first f<strong>in</strong>ished production i.e. <strong>the</strong> magnetism part <strong>of</strong> Air Disc Brake. In this<br />

sketch <strong>in</strong> order to show <strong>the</strong> relationship <strong>of</strong> <strong>the</strong> two assembly l<strong>in</strong>es, a connection l<strong>in</strong>e is<br />

used between station 4 <strong>of</strong> <strong>the</strong> preassembly <strong>and</strong> station 5b <strong>of</strong> <strong>the</strong> ma<strong>in</strong> l<strong>in</strong>e <strong>in</strong>stead <strong>of</strong> <strong>the</strong><br />

deposited area. Among <strong>the</strong> stations PA2, MA4, MA7 <strong>and</strong> MA8 are auto process<strong>in</strong>g<br />

<strong>and</strong> worked by robots.<br />

Figure 3.1 Simplified Assembly L<strong>in</strong>e<br />

Among <strong>the</strong> data <strong>of</strong> assembly l<strong>in</strong>e ga<strong>the</strong>red from <strong>the</strong> workshop, process<strong>in</strong>g time <strong>and</strong><br />

maximum queue length <strong>of</strong> each step can be used <strong>in</strong> “Extend v6” directly when set up<br />

simulation model. While <strong>the</strong> data <strong>of</strong> TTF <strong>and</strong> TTR are statistic data, which has to<br />

analyze before used <strong>in</strong> build<strong>in</strong>g model. In this paper, <strong>the</strong> data will be analyzed <strong>in</strong><br />

Micros<strong>of</strong>t Excel <strong>and</strong> SPSS. The two groups <strong>of</strong> data for different stations will be<br />

analyzed separately. First data for station 2 <strong>in</strong> preassembly l<strong>in</strong>e will be analyzed <strong>and</strong><br />

<strong>the</strong>n <strong>the</strong> f<strong>in</strong>al assembly l<strong>in</strong>e data for station 8. The analysis methods <strong>and</strong> threads are<br />

similar.<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!