Urban Services BoundaryAs noted previously, a major new concept of this edition of the State <strong>Land</strong> <strong>Use</strong> Policiesand Plan is delineation of an Urban Services Boundary on the Future <strong>Land</strong> <strong>Use</strong> PlanMap. The intent of showing an urban services boundary is to denote a significantdemarcation in urban pattern – the future boundary of areas that should be more urban incharacter versus those that should retain a more rural character. In other words, the“urban/rural” systems approach. It provides an indication for planning purposes of areaswhere a higher level of public services exists or is anticipated to be available toaccommodate more intensive development. Conversely, public services in areas outsidethe Urban Services Boundary are anticipated to be more limited, and planneddevelopment intensities should accordingly be lower. Furthermore, land outside theUrban Services Boundary may be best suited for reservation as conservation areas andproductive rural resource lands.The Urban Services Boundary may be considered a general bound of the areas withinwhich public services supporting urban development presently exist, or are likely to beprovided, through <strong>2025</strong>. Within this urban services area, most land is served by publicwater service and many areas have (or will have) public sewer service available as well.Public transit service is generally available, with high-density corridors providingfrequent headways. These fully serviced areas should be regarded as a scarce resource,that absent significant constraints, should be developed (or redeveloped) at higherintensities and densities so as to optimize the significant public infrastructure investment.Note: Several watersheds and other sensitive resource areas that presently have publicwater service have been excluded from the Urban Services Boundary, indicating thatprotection of the resources involved must be a principle concern limiting futuredevelopment intensity potential.Growth AreasGrowth Areas are areas intended to accommodate the State’s anticipated growth needsthrough <strong>2025</strong>. They include both (currently) developed areas that are suited formaintenance, infill, and reuse, as well as (currently) undeveloped areas that are suited fornew development. Growth Areas fall into two categories: 1) areas within the urbanservices boundary, shown as two map categories – Urban Development and SeweredUrban Development; and 2) centers, shown illustratively on the map, both inside andoutside the urban services boundary.Urban Development and Sewered Urban DevelopmentAreas within the Urban Services Boundary found to have potential to accommodatedevelopment are designated as these two categories. The categories include land onwhich development is already in place and may include underutilized lands (such asabandoned or derelict commercial and industrial sites). Such developed land presentsopportunities for meeting the State’s growth needs through maintenance, infill, and reuse.2-16<strong>Land</strong> <strong>Use</strong> <strong>2025</strong>: Rhode Island State <strong>Land</strong> <strong>Use</strong> Policies and Plan (April 2006)
The categories also include undeveloped land whose location and characteristics make itsuitable for development.The Sewered Urban Development category is depicted on the map to show the limitedareas within the Urban Services Boundary that have public sewer service available.These fully serviced areas should be regarded as a scarce resource, that absent significantconstraints, should be developed [or redeveloped] at higher intensities and densities so asto optimize the significant public infrastructure investment.Priorities for developed lands in the urban categories are maintenance and enhancementof productive uses and re-use of underutilized areas to accommodate growth at intensitiesthat efficiently utilize available services.Typical uses in these categories include residential of varying types and generally ofmedium (1-2 dwelling units per acre) to high (5+ dwelling units per acre) densities (withmany areas at substantially higher densities exceeding 20 units per acre, see Figure 121-03(1) for examples), along with substantial commercial, industrial, mixed, andinstitutional uses, and supporting infrastructure (transportation, utilities, parks, andrecreation areas).Uncommitted land within the Urban Development and Sewered Urban Developmentcategories is generally capable of accommodating various intensities of urban-typedevelopment. Some undeveloped areas have few resource constraints and have, or arelikely to be provided with, urban-level services including public water, transit, and insome locations sewer service, by <strong>2025</strong>. In these high capability/serviced areas, thepriority is development with intensities and residential densities that mirror existingurban developed lands and enable efficient provision and utilization of public servicesincluding transit.Other areas of uncommitted land may have some resource constraints, but have, or arelikely to be provided with, some urban-level services, especially public water service, by<strong>2025</strong>. These areas are generally capable of accommodating a medium level of urbandevelopment. They would generally include residential uses at average densities of 1 to 5dwelling units per acre (with some areas of higher density), including single-familydwellings (attached and detached), garden apartments and similar multi-familycomplexes. They may include areas of mixed residential, commercial, and low-impactindustrial uses, as well as office/industrial areas and supporting institutional uses andinfrastructure. Areas with just public water service and few development constraints arecapable of moderate intensity development with residential densities of between 1 and 5dwelling units per acre.Other undeveloped areas within the Urban Development category have site and/orresource constraints, or limited services. Such areas are more appropriate for lesserdevelopment intensity. Residential uses in such areas will tend to be at the lower end ofthe density range – an average density of under one dwelling unit per acre, and significantareas would be expected to be reserved as open land (farmland, forests, wetlands).<strong>Land</strong> <strong>Use</strong> <strong>2025</strong>: Rhode Island State <strong>Land</strong> <strong>Use</strong> Policies and Plan (April 2006) 2-17
- Page 2: The Statewide Planning Program, Rho
- Page 5: Advisors to the Technical Committee
- Page 8 and 9: objectives is the only way we can p
- Page 10: In addition, there are four technic
- Page 13 and 14: Institutional .....................
- Page 15: LIST OF TABLESTable 121-03(1) Perce
- Page 19 and 20: PART ONE: WHERE ARE WE AND WHERE AR
- Page 21 and 22: distinction between historic urban
- Page 23 and 24: constructed on larger lots than in
- Page 25 and 26: major pubic investments, such as re
- Page 27 and 28: and also included a continuation of
- Page 30 and 31: Geographically, the Current Trend S
- Page 33: PART TWOWHERE DO WE WANT TO BE IN 2
- Page 36 and 37: Gauging Public Perceptions of Land
- Page 38 and 39: etween the historic urban centers a
- Page 40 and 41: to provide guidance for the (vast m
- Page 42 and 43: LUO 4C: Utilize infrastructure to a
- Page 44 and 45: LUP 12: Encourage development patte
- Page 46 and 47: commercial, and institutional devel
- Page 48 and 49: comprehensive plans and supporting
- Page 52 and 53: Conservation/open space-style devel
- Page 54 and 55: Narragansett Indian Tribal LandsThi
- Page 57 and 58: PART THREE: WHAT ISSUES DO WE NEED
- Page 59 and 60: need of replacement), expanded faci
- Page 61 and 62: • wastewater system design and ca
- Page 63 and 64: • Less than five percent of Rhode
- Page 65 and 66: To help address its housing needs,
- Page 67 and 68: - needs to be upgraded, the advanta
- Page 69 and 70: How This Land Use Plan Supports Sta
- Page 71 and 72: industry has resulted. Since the 19
- Page 73 and 74: municipal plans as future commercia
- Page 75 and 76: The Future Land Use 2025 map identi
- Page 77 and 78: modifications, the capacity of floo
- Page 79 and 80: Restoration and maintenance of the
- Page 81 and 82: The best locations for redevelopmen
- Page 83 and 84: 3-6 Open Space and RecreationThe te
- Page 85 and 86: • How much land overall should be
- Page 87 and 88: Providence to Warwick and Wickford,
- Page 89 and 90: Another disincentive to walking and
- Page 91: Designers and the community at larg
- Page 95 and 96: PART FOUR: HOW DO WE GET THERE?4-1
- Page 97 and 98: density or medium-high density deve
- Page 99 and 100: Table 121-04(2)COMPOSITE OF FUTURE
- Page 101 and 102:
This section describes the process
- Page 103 and 104:
wetlands comprised about 18 percent
- Page 105 and 106:
Table 121-04(5) defines the five la
- Page 107 and 108:
For undeveloped areas, the analysis
- Page 109 and 110:
4-8 Scenario Analysis: Assessing Al
- Page 111 and 112:
A major variable in distinguishing
- Page 113 and 114:
The land need projections for the f
- Page 115 and 116:
Land Use 2025: Rhode Island State L
- Page 117 and 118:
Land Use 2025: Rhode Island State L
- Page 119 and 120:
Table 121-04(10)QUANTITATIVE* COMPA
- Page 121 and 122:
The concentration of development in
- Page 123 and 124:
4-10 Scenario SelectionIn August 20
- Page 125 and 126:
Table 121-04(12)COMPARISON OF COMPO
- Page 127:
PART FIVEWHAT MUST BE DONE TOACHIEV
- Page 130 and 131:
5-2 State InvestmentsAs noted in Pa
- Page 132 and 133:
land use plan must contain an analy
- Page 134 and 135:
Table 121-05(1)GOALS, OBJECTIVES, A
- Page 136 and 137:
Strategies12Support the participati
- Page 138 and 139:
Community DesignLeadAgenciesTimeFra
- Page 140 and 141:
7Locate small-scale convenience sho
- Page 142 and 143:
InfrastructureLeadAgenciesTimeFrame
- Page 144 and 145:
4Limit the proliferation of treatme
- Page 146 and 147:
3Coordinate transportation and land
- Page 148 and 149:
3Promote establishment of electroni
- Page 150 and 151:
AbbreviationCRMCDEMDOADOHDOTEDCGAGO
- Page 152 and 153:
Source Management Plan, State Guide
- Page 154:
41. Office of Federal Housing Enter