CITY 1.24 and 2.24 GN CITY 1.24 and 2.24 B/P
CITY 1.24 and 2.24 GN CITY 1.24 and 2.24 B/P
CITY 1.24 and 2.24 GN CITY 1.24 and 2.24 B/P
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8.8.4 Switching off the boiler<br />
Set switch G to “off/anti-freeze”:<br />
The boiler goes to the st<strong>and</strong>by mode <strong>and</strong> the display<br />
indicates<br />
Note: In this operating mode only the boiler is<br />
protected against freezing.<br />
8.8.5 Anti-overflow safety check<br />
If fumes overflow through the anti-backflow device,<br />
the anti-overflow safety device 24 disconnects the<br />
electrical output supply to the valve <strong>and</strong> the boiler<br />
goes to its fail-safe mode.<br />
The anti-overflow device must be checked on commissioning<br />
the boiler <strong>and</strong> during annual maintenance.<br />
Check procedure:<br />
- Turn off the boiler by setting the 3-position switch G<br />
to “off/anti-freeze”.<br />
- Remove the pipe connecting the boiler to the flue.<br />
- Using a sheet of metal (or any other heat-resistant<br />
material), block the combustion product outlet of the<br />
boiler.<br />
- Start the boiler; combustion products are evacuated<br />
in the upper part of the boiler via the openings in the<br />
anti-backflow device.<br />
- The anti-overflow sensor disconnects the electrical<br />
output supply from the gas valve within 2 minutes.<br />
The burner is turned off.<br />
- After completing the check, replace the pipe<br />
connecting the boiler to the flue. The boiler restarts<br />
automatically after about 10 minutes.<br />
Note: To avoid this time delay it is sufficient to switch off<br />
the mains electrical output supply <strong>and</strong> switch it on<br />
again.<br />
20<br />
G<br />
24<br />
8666N096<br />
8666N118