11.07.2015 Views

IMCP - U.S. Army

IMCP - U.S. Army

IMCP - U.S. Army

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Line of Effort (LOE) Key to Success MetricsLOE METRIC # LOE METRIC NAME LOE METRIC DESCRIPTION LOE METRIC FORMULA*5.4.2Safety Performance Objectives[Y/N]% of Garrisons that have established safetyperformance requirements in all military efficiencyreports and civilian employees’ performance plans.Did your Garrison Establish Safety PerformanceRequirements in all Military Efficiency Reports & CivilianEmployees' Performance Plans?(Y = 1; N = 0)KTS SF5: Support Senior Commanders’ Safety and Occupational Health Programs5.5.1Installation Safety and Occupational HealthAdvisory Councils% of Garrison safety related issues identified duringthe Installation Safety and Occupational HealthAdvisory Councils which are subsequently closed.# of Garrison related Safety issues identified during theInstallation Safety and Occupational Health AdvisoryCouncils which have been closed during the GarrisonSafety and Occupational Health Advisory Council / # ofGarrison related Safety issues identified during theInstallation Safety and Occupational Health AdvisoryCouncils5.5.2Standard <strong>Army</strong> Safety and Occupational Healthinspections% of required Standard <strong>Army</strong> Safety and Occupational # of required inspections completed / # of requiredHealth Inspections completedinspectionsLOE 6: Energy Efficiency and SecurityKTS EN1: Reduced Energy and Water Consumption6.1.1 Reduced energy consumption% Reduction in energy consumption per square foot(15% in 2010, 18% in 2011, 21% in 2012, 24% in 2013,27% in 2014, and 30% in 2015).[Current FY Energy (MBtu/KSF)/FY03 Energy (MBtu)]6.1.2 Reduced water consumption% Reduction in potable water consumption per[Current FY Potable Water(MGAL/KSF)/FY06 Potablesquare foot (6% in 2010, 8% in 2011, 10% in 2012, 12%Water (MGAL/KSF)]in 2013, 14% in 2014, and 16% in 2015).6.1.3Accurate and timely reporting of AESIS metrics% accurate and timely reporting of AESIS metrics[# of Commands reporting AESIS metrics accurately andtimely/Total # of commands required to report AESISmetrics]*NOTE: Formula subject to change during SMS metric deployment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!