Reference Manual<br />

00809-0100-4804, Rev AA<br />

January 2011<br />

Reassemble the <strong>Process</strong><br />

Flange<br />

<strong>Rosemount</strong> <strong>3051S</strong> ERS System<br />

<strong>3051S</strong> ERS Secondary (Junction Box)<br />

1. Apply a light coat of low temperature silicon grease to the SuperModule<br />

connector.<br />

2. Insert the SuperModule connector into the top of the SuperModule.<br />

3. Push the terminal block into the housing and hold for screw position<br />

alignment.<br />

4. Tighten the captive mounting screws.<br />

5. Attach the Junction Box housing cover and tighten so that metal contacts<br />

metal to meet explosion-proof requirements.<br />

NOTE<br />

If the installation uses a manifold, see “<strong>Rosemount</strong> Manifolds” on page 2-21.<br />

1. Inspect the SuperModule PTFE o-rings. If the o-rings are undamaged,<br />

reusing them is recommended. If the o-rings are damaged (if they have<br />

nicks or cuts, for example), replace them with new o-rings.<br />

NOTE<br />

If replacing the o-rings, be careful not to scratch or deface the o-ring grooves<br />

or the surface of the isolating diaphragm when removing the damaged<br />

o-rings.<br />

2. Install the process flange on the SuperModule. To hold the process<br />

flange in place, install the two alignment screws to finger tight (screws<br />

are not pressure retaining). Do not over-tighten; this will affect<br />

module-to-flange alignment.<br />

3. Install the appropriate flange bolts.<br />

a. If the installation requires a 1 /4-18 NPT connection(s), use four<br />

1.75-in. flange bolts. Go to step d.<br />

b. If the installation requires a 1 /2–14 NPT connection(s), use two<br />

2.88-in. process flange/adapter bolts and two 1.75-in. bolts. Go to<br />

step c.<br />

c. Hold the flange adapters and adapter o-rings in place while<br />

finger-tightening the bolts. Go to step e.<br />

d. Finger-tighten the bolts.<br />

e. Tighten the bolts to the initial torque value using a crossed pattern.<br />

See Table 4-1 on page 4-12 for appropriate torque values.<br />

f. Tighten the bolts to the final torque value using a crossed pattern.<br />

See Table 4-1 for appropriate torque values. When fully tightened,<br />

the bolts should extend through the top of the module housing.<br />

g. If the installation uses a conventional manifold, then install flange<br />

adapters on the process end of the manifold using the 1.75-in. flange<br />

bolts supplied with the <strong>3051S</strong> ERS sensor.<br />

4-11