12.07.2015 Views

Eurasian Integration Yearbook 2012

Eurasian Integration Yearbook 2012

Eurasian Integration Yearbook 2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Aigul Absametova. “<strong>Integration</strong> Processes in the Electric PowerSectors of the EDB Member States”Advanced Economic Cooperationin Sectors and IndustriesTable 11.9.Development, production and supply of electric power equipment and design documents by Russian companies (November 2011)Facility Company Form of contract Equipment Investments, timeframesArmeniaArmenian NPP TVEL JSC Supply and research andengineering support to the useof nuclear fuelNuclear fuel for the plant Long-term contractARMZ UraniumHoldingGeological explorationRosatom Technical assistance from IAEAto improve safety at the plant2,040 million roubles in 2008(financing from Russia’s contribution tothe IAEA extra-budgetary fund)Rosatom Design of a new unit at the plant Design documents 2010 – to dateBelarusLukoml GRES Power Machines Manufacture and supply ofequipmentManufacture and supplyof equipment for themodernisation of a 300 MWUnit 3Contract value $7 million, 2010Vitebsk TPP Power Machines Manufacture and supply ofequipmentManufacture and shipment ofa 50 MW steam turbinePT-40/50-8.8-1.0 and agenerator2010-2011, completedPolotsk HPP Technopromexport Design, construction, supply andinstallation of equipment, start-upand commissioning of a hydro unitConstruction of a 21.6 MWhydropower plantA loan from EDB in the amount of450.3 billion Belarusian roublesKazakhstanEkibastuz GRES-2 Consortium of COTES-Kazakhstan and COTES(Novosibirsk)Preparation of Unit 3 designestimatesDesign documents 2010 – to date<strong>Eurasian</strong> Development Bank197

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!