13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

?*2«3*1 (Cont f d«)(July 77)Appendix 7 - Land Development Proposals f Routing Sheet fAppendix 8 - Land Development Proposals f Check List*(c) Cost of i Diversion of Roads and DrainsThe estimated cost of diversions in respect of roads and drainsmust be quoted in Form FG whenever this work is to be carried out byGovernment as a charge to the lot owner* As the estimated cost ofthe works affects the premium paid for the lot, the estimate must bereasonably accurate* The estimate should be conditioned by a note"Subject to confirmation when final lease conditions are being drawnup 8 *,The estimated cost (which must include Departmental OverheadCharges - normally 20$) given in the final lease conditions is afixed sum, which is paid into a Government revenue account and cannotbe varied either up or down irrespective of the actual cost of theworks «(d)(a)(b)(c)Time for CirculationUnder normal circumstances no Division should require to retainForm KJ/Engineering Conditions for a period longer than 2 weeks* Ifproblems connected with a particular site make a Division likely toretain the Form FG/Engineering Conditions for longer than 2 weeks,C.L, & S*0* or N,T.D*D«, should be immediately informed by the Divisionconcerned*by Authorised .......PersonsIntroductionBequests and enquiries from Authorised Persons are generallyconfined to information connected with road and drainage works adjacentto* affecting, or likely to affect, development or re-development*Ho Known Proposals for Future Alteration to RoadsWhere the development or re-development adjoins an existing roadfor which there are no known proposals for any future alterationslikely to result in a change of the widths or levels currently existing,the A.P« should be informed that no change is contemplated and theexisting widths and levels may therefore be taken as correct fordesign purposes*Firm and Approved Proposals to RoadsWhere the development or re-development, adjoins a road for whichthere are firm and approved proposals for future changes likely toaffect the A*P* development proposals, all relevant information,abstracted from the appropriate fown Plan or approved layout plan,should be superimposed on a copy of the A*P« f s drawing and returned

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!