13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V*1*2«1 (Cont f d*)(July 7?)(ii)determination of geometric and cross-section standards by T.E*Division!(iii) design tentative alignment based on (ii) by T«E* Division?(iv)(v)production of estimates of construction based on (iii) and whererequired provide alternative alignments based on cost comparisonssuch as earthworks f retaining walls and structures etc* byHighways (Works) Division!selection of a final alignment for possible adoption andcirculation by T.E* Division*Copies of the finalised plans together with the standard memorandum atAppendix 6 asking for comments f estimates of cost of work and estimates ofcompensation will be sent to the following sDirector of Water SuppliesPrincipal Government Architect, ifconcernedChief Engineer* Drainage WorksChief Engineer, Portworks, if concernedChief Engineer, Development and Airport,if concernedfor commentsand estimatesChief Engineer, Highways DivisionChief Estate Surveyor (Yaluation)Principal Government Town PlannerCommissioner for TransportCommissioner of Police (D.T.)principal Government Building Surveyorfor commentsDirector, Urban Services (if amenities,trees, hawkers, markets, U.S»D* cleaningbuildings or sites reserved for themare involved)Director of Fire ServicesPrincipal Government Highway EngineerGovernment Land AgentGovernment Land Surveyorfor information

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!