13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

v.rAppendix 2 - p*3(July 77)3*7 Dgglfi&jyata - TrafficThe main criteria to be given are speed* gradients, sightdistances f radii* transitions, lane widths, superelevation, verticalcurves, etc* The design of ground level intersections (whereapplicable) should be outlined*3*8 ProgrammeStage IIThis should indicate both a tentative "time 1 * and a "phases ofwork" schedule* The programme should be produced in association withthe Works Branch*(a) The "time 1 * schedule should allow for the following i(b)4*1 Introduction(i) all administrative stages}(ii) all design stagesf(iii) pre-contract stage|(iv) Contract time*The "phases of work" schedule should include the majorphasings of work f major traffic routings etc*This section of the Handbook should be compiled by the WorksBranch* (See Item 15 of Check List)4*2 Land and Legal RequirementsThe major land problems are ;(a)(b)(c)(d)acquisition of land by resumptionfclearance of squatters etc*}allocation of site}Works areas etc*These must be concisely laid down together with an assessment of thetime required for the administrative procedures.' Early consideration of possible action under the Streets(Alterations) and P*H. & W« Ordinances is required*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!