13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(July 11}2.5 PRIVATEForms FGForms FG are circulated by C*L«S»0* or N»T»D«D« to(i) the appropriate Highways Works Division; or ?(ii) the New Territories Development Offices to obtaininformation and requirements in connection witha private lot to be developed or redeveloped®(a) Areas under Highways Works Divisions ? ControlForm FG must be circulated to the various officers in thecorrect sequence and action should be taken in accordance withDivisional Bouting Sheet at Appendix 1*The major responsibilities of the officers are sS.E.A* (Civil)Asst* EngineerEngineerSenior Engineer •-- Insertion of all informationregarding roads f drains, lotboundaries.Visit site and verification ofall road f drainage, lot andcatchwater information* Completionof Form FG in draft, preparationof sketch drawings and firm estimatesfor work to be done* (This mustinclude Departmental OverheadCharges as applicable*)Check drawings, estimates and suggestedclauses for Form FG* Liaise withCapital Works Engineer for anyconditions necessary in connectionwith work being planned or underconstruction* Submit comments andrecommendations to S*B* withclarification of ambiguities as aresult of comments from other officers*Ensure that all other parties concernedhave been asked to comment (SeeAppendix 1)»Complete Form FG and initial relevantclauses*Filing Clerk - Open andprepare file for routing etc*Duplicate remarks of S*E» and pass onto C*E*Chief Engineer - Peruse Form FG and sign*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!