13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(July 77)1 *41*4*1OHThese instructions establish the procedure to be followed inobtaining authority to carry out w.C. on B* General Authority isgiven in (25) in BL 51/5181/49 VI (Appendix 17).¥«C» on D. items are compiled into monthly programmes (Appendix 18)and passed to C.H.E. (w) before 24th of each month for approval*The categories or types ©f work that may be carried out as W.C. onD* are given in full in Appendix 17 and the necessary information must begiven for each and every item on the programmes*1*4*2 Prearation ofProgrammes should be prepared in the form of Appendix 18*Highways (vorlcs) Division will •(i)(ii)(iii)consult with the appropriate T.E* Division and/orDrainage Works Division as necessary?prepare the programme, allotting each programme aniMber in the form month/division/year (e«g*2/H.K./71)*prepare the drawings (1s 500 or 1: 1000 natural scale)for each item in the programme}(iv) forward copies of the programme and drawings as follows :G.H.E./W.T.E. Div.D.W. Div.Copies ofProgrammes Drawings411111G.H*E«/W« will advise the appropriate Highways (Works) and T.E,ons of the approval, with copies of the programme only to D*P.W. fD* of A* and Director of Accounting Services*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!