13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V.1Appendix 5 -(July ?7)(b)(c)(d)load proflies f and road cross-sections*General arrangement of structures- showingtypical details f Including if necessary 9drainage details*Construction staging Including road and/ordrainage diversions»3*7 EstimatesThe report should give an assessment of quantities and costsof main Items« The estimate should be prepared in the form as shownin the Check List with all the relevant sections completed* If thecost of any particular section of work is weighted e*g* because ofdifficulties of access f this should be clearly stated and the reasonsgiven* If any part of the project has not been Included In theestimate $ this should also be stated and the reasons given*5«8 CirculationIt is probable that this will change from time to time but asuggested Circulation List is as follows 21. H.O* H*Q* - 3 copies}2* Works Division - 2 copies}3* T«E* Division - 1 copy;4* G»B« (M«T.) - 1 copy (where M«T* Proposalsare affected)?5* C*E*CjyU - 1 copy (for Consultants Workonly)i6, C.E* Structural Design- 1 copy (where structuraldesign is carried outby that Division)*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!