13.07.2015 Views

X - HKU Libraries

X - HKU Libraries

X - HKU Libraries

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

¥«2,5*3 (Cont'd*)(July 77)(e)(f)(g)Corner SitesWhen a comer site is developed or redeveloped f considerationshould be given to the provision of a comer splay* The same procedureas laid doici for corner splays in Vol« V f Chapter 1 should be followed,Sheet .PilingBequests for driving sheet piling outside lot boundaries shouldbe referred to G»L«1®Sheet piling may be driven so that the inner face coincides withthe lot boundary* Due to the depth of the web f the outer face may lieoutside the lot boundary* If left in situ the piles should be cut offafterwards by the developer to a depth of 2 m below the footpath orroad level«Bored Piles $ CaissonsLarge diameter bored piles, caissons or any other foundationstructures should be totally within the lot boundary*

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!