13.07.2015 Views

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REV A (05-01-09)INSTALLATION MANUAL – D522. Using Figure 24 as a general guide for cable routing.Figure 24. Cable Routing Diagram23. Route the cable under the sheave of the first pulley to the underside of the sheave to theon the other sheave on the opposite side of the cylinder (see Figure 25).Figure 25. Routing Cable under SheaveSECTION 4 – UNPACKING AND PUMP UNIT PREASSEMBLY17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!