13.07.2015 Views

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

Installation Manual - Model 5 - Tundra Process Solutions Ltd.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

REV A (05-01-09)INSTALLATION MANUAL – D530. Allow the pressure in the counterweight to equalize with the compressor pressure prior tostarting the pressure amplification phase.31. Monitor the 3/8-inch and 1 1/2-inch fitting connections for leaks during the fillingprocess by applying soapy water and looking for bubbles. Verify that the ball valves areopen when monitoring for leaks to test the downstream fittings up to the cap.32. Grind off the brace on the base using a portable electric grinding tool (see Figure 31).BraceFigure 31. Brace Removal on Base Unit33. Once the pipe is charged, close the charge ball valve and terminate charging process.34. Reinstall the 3/8-inch cap to the charge valve assembly.35. The assembly may now be moved by placing the V-block dolly under the pulley end ofthe counterweight and the using a forklift to tow the other end by attaching to the basecross member using the holes provided.SECTION 3 – TOOLS & SPECIAL EQUIPMENT20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!