13.07.2015 Views

FMI 3-34.119 - Soldier Support Institute - U.S. Army

FMI 3-34.119 - Soldier Support Institute - U.S. Army

FMI 3-34.119 - Soldier Support Institute - U.S. Army

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ReferencesJOINT PUBLICATIONSJP 1-02. Department of Defense Dictionary of Military and Associated Terms. 12 April 2001.JP 3-34. Engineer Doctrine for Joint Operations. 5 July 2000.JP 4-04. Joint Doctrine for Civil Engineering <strong>Support</strong>. 27 September 2001.MISCELLANEOUS<strong>Army</strong> Campaign PlanJoint Vision 2020. June 2000.STANDARDIZATION AGREEMENTSSTANAG 2221 (EOD). Explosive Ordnance Disposal Reports and Messages-AEODP-6February-2001. 1 June 2001.STANAG 2237 (ENGR). Obstacle Numbering.STANAG 2283. Military Search (Draft).STANAG 2430 (ENGR). Land Forces Combat Engineer Messages, Reports and Returns (R2) –AengrP-2(B). 18 August 2004.DOCUMENTS NEEDEDThese documents must be available to the intended users of this publication. The asterisk denotes that thissource was also used to develop this publication.ARMY PUBLICATIONSDA Form 2028. Recommended Changes to Publications and Blank Forms.*FM 1-02. Operational Terms and Graphics. MCRP 5-12A. 21 September 04.*FM 2-0. Intelligence. 17 May 2004.*FM 3-34. Engineer Operations. 2 January 2004.*FM 3-90. Tactics. 4 July 2001.*FM 3-100.12. Risk Management for Multiservices Tactics, Techniques, and Procedures.MCRP 5-12.1C/NTTP 5-03.5/ AFTTP(1) 3-2.34. 15 February 2001.*FM 3-100.38. (UXO) Multiservice Procedures for Unexploded Ordnance in a Joint Environment.MCRP 3-17.2B/NTTP 3-02.4.1 (Rev A)/AFTTP (1) 3-2.12. 23 August 2001.*FM 4-30.5. Explosive Ordnance Disposal Operations. 28 April 2005.*FM 5-0. <strong>Army</strong> Planning and Orders Production. 20 January 2005.*FM 5-116. Engineer Operations: Echelons Above Corps. 9 February 1999. (Will be revised asFM 3-34.211.)*FM 6-20-10. Tactics, Techniques, and Procedures for the Targeting Process. MCRP 3-1.6.14.8 May 1996.*FM 7-92. The Infantry Reconnaissance Platoon and Squad (Airborne, Air Assault, Light Infantry).23 December 1992.*FM 7-100. Opposing Force Doctrinal Framework and Strategy. 1 May 2003.*FM 20-32. Mine/Countermine Operations. 29 May 1998. (Will be revised as FM 3-34.210.)*FM 21-16/MCWP 3-17.3. Unexploded Ordnance (UXO) Procedures. FMFM 13-8-1. 30 August1994. (Will be revised as FM 4-30.11.)*FM 34-130. Intelligence Preparation of the Battlefield. 8 July 1994. (Will be revised as FM 2-01.3.)*FM 90-7. Combined Arms Obstacle Integration. 29 September 1994. (Will be revised asFM 3-90.13.)*FM 100-14. Risk Management. 23 April 1998.References-2 <strong>FMI</strong> 3-<strong>34.119</strong>/MCIP 3-17.01 21 September 2005

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!