13.07.2015 Views

part three - Fishers Ghost

part three - Fishers Ghost

part three - Fishers Ghost

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

21. Soil and Water Management PlanPrior to Council or an accredited certifier issuing a construction certificate, adetailed soil and water management plan shall be submitted for approval.22. Stormwater Management Plan (Development)Prior to Council or an accredited certifier issuing a construction certificate, aplan indicating all engineering details and calculations relevant to siteregrading and the collection and disposal of stormwater from the site,building/s and adjacent catchment, shall be submitted for approval. Floorlevels of all buildings shall be a minimum of 150mm above the adjacentfinished site levels and stormwater shall be conveyed from the site to a pipeddrainage system under Council's control. All proposals shall comply with theCampbelltown (Sustainable City) DCP 2009 - Volumes 1 and 2.23. Drainage EasementPrior to Council or an accredited certifier issuing a construction certificate, theapplicant shall submit a suitable plan for approval by Council and have itregistered with Land and Property Information NSW for the creation of asuitable drainage easement to enable stormwater runoff to be conveyed fromthe subject site to Council’s drainage system in a manner specified byCouncil.24. Work on Public LandPrior to Council or an accredited certifier issuing a construction certificate, theapplicant shall obtain written approval from Council for any proposed work onpublic land. Inspection of this work shall be undertaken by Council at theapplicants expense and a compliance certificate, approving the works, shallbe obtained from Council prior to the principal certifying authority issuing anoccupation certificate.25. Section 94A Developer Contribution - Community Facilities and ServicesPrior to Council or an accredited certifier issuing a Complying DevelopmentCertificate or a Construction Certificate (or where a Construction Certificate isnot required, a Subdivision Certificate), the applicant shall provide a receiptfor the payment to Council of a community facilities and services contributionin accordance with the provisions of the Campbelltown City Council Section94A Development Contributions Plan.For the purposes of calculating the required S94A contribution, where thevalue of the total development cost exceeds $100,000, the applicant isrequired to include with the application for the respective certificate, a reportsetting out a cost estimate of the proposed development in accordance withthe following: where the value of the proposed development is greater than $100,000but less than $500,000, provide a Cost Summary Report by a personwho, in the opinion of the Council, is suitably qualified to provide a CostSummary Report (Cost Summary Report Template 1). All Cost

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!