13.07.2015 Views

part three - Fishers Ghost

part three - Fishers Ghost

part three - Fishers Ghost

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The following conditions of consent have been imposed to ensure that theadministration and amenities relating to the proposed development comply with allrelevant requirements. These conditions are to be complied with during theconstruction of the development on site.35. Construction Work HoursAll work on site shall only occur between the following hours:Monday to FridaySaturdaySunday and public holidays7.00am to 6.00pm8.00am to 1.00pmNo Work.36. Erosion and Sediment ControlErosion and sediment control measures shall be provided and maintainedthroughout the construction period, in accordance with the requirements ofthe manual – Soils and Construction (2004) (Bluebook), the approved plans,Council specifications and to the satisfaction of the principal certifyingauthority. The erosion and sedimentation control devices shall remain inplace until the site has been stabilised and revegetated.Note: On the spot penalties up to $1,500 will be issued for any noncompliancewith this requirement without any further notificationor warning.37. Work ZonesAll loading, unloading and other activities undertaken during construction shallbe accommodated on the development site.Where it is not practical to load, unload or undertake specific activities on thesite during construction, the provision of a ‘Work Zone’ external to the sitemay be approved by Council following an application being submitted toCouncil’s Traffic Unit outlining the proposal for the work zone. Theapplication is required to be made prior to the commencement of any worksand is to include a suitable ‘Traffic / Pedestrian Management and ControlPlan’ for the area of the work zone that will be affected. All costs of approvedtraffic / pedestrian control measures, including relevant fees, shall be borneby the applicant.38. Protection of Existing TreesDuring construction, no trees are to be cut down, lopped, destroyed orremoved without the separate written approval of Council unless those treesare within <strong>three</strong> (3) metres of the footprint of a building that has beenapproved by Council.All trees that are to be retained are to be protected by fencing, firmly stakedwithin the drip line/ canopy of the tree and maintained during the duration ofthe works. The area within the fencing must not be used for stockpiling of anymaterial, nor for vehicle or pedestrian convenience.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!