13.07.2015 Views

part three - Fishers Ghost

part three - Fishers Ghost

part three - Fishers Ghost

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

31. Footpath and Vehicular Crossing LevelsPrior to the commencement of any work, footpath and vehicular crossinglevels are to be obtained from Council by lodging an application on theprescribed form.32. Demolition Works33. FencingDemolition works shall be carried out in accordance with the following:a. Prior to the commencement of any works on the land, a detaileddemolition work plan designed in accordance with Clause 1.7.3 ofAustralian Standard AS 2601-2001 – The Demolition of Structures,prepared by a suitably qualified person with suitable expertise orexperience, shall be submitted to and approved by Council and shallinclude the identification of any hazardous materials, method ofdemolition, precautions to be employed to minimise any dust nuisanceand the disposal methods for hazardous materials.b. Prior to commencement of any works on the land, the demolitionContractor(s) licence details must be provided to Council.c. The handling or removal of any asbestos product from the building/sitemust be carried out by a NSW Work Cover licensed contractorirrespective of the size or nature of the works. Under no circumstancesshall any asbestos on site be handled or removed by a non-licensedperson. The licensed contractor shall carry out all works in accordancewith NSW Work Cover requirements.d. An appropriate fence preventing public access to the site shall be erectedfor the duration of demolition workse. Immediately prior to the commencement of the demolition or handling ofany building or structure that contains asbestos, the applicant shallrequest that the principal certifying authority attend the site to ensure thatall appropriate safety measures are in place. The applicant shall alsonotify the occupants of the adjoining premises and WorkCover NSW priorto the commencement of any works.An appropriate fence preventing public access to the site shall be erected forthe duration of construction works.34. Structural Engineer DetailsPrior to the commencement of any works, the submission to the principalcertifying authority of all details prepared by a practicing structural engineer.DEVELOPMENT REQUIREMENTS DURING CONSTRUCTION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!