10.08.2015 Views

Risico’s van een gevirtualiseerde IT-omgeving

Risico's van een gevirtualiseerde IT-omgeving - Vurore

Risico's van een gevirtualiseerde IT-omgeving - Vurore

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Risico’s</strong> <strong>van</strong> <strong>een</strong> <strong>gevirtualiseerde</strong> <strong>IT</strong>-<strong>omgeving</strong> Possen & Ulrich----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ProcessnumberProcessControlobjectivenumberControl objectiveAI06 Manage changes AI6.4 Change Status Tracking andReportingAI06 Manage changes AI6.5 Change Closure andDocumentationDS03DS03DS03DS03DS03Manage performanceand capacityManage performanceand capacityManage performanceand capacityManage performanceand capacityManage performanceand capacityDS3.1DS3.2DS3.3Performance and CapacityPlanningCurrent Performance andCapacityFuture Performance andCapacityControl objective descriptionEstablish a tracking and reporting system to document rejected changes,communicate the status of approved and in-process changes, and completechanges. Make certain that approved changes are implemented as planned.Whenever changes are implemented, update the associated system and userdocumentation and procedures accordingly.Establish a planning process for the review of performance and capacity of <strong>IT</strong>resources to ensure that cost-justifiable capacity and performance areavailable to process the agreed-upon workloads as determined by the SLAs.Capacity and performance plans should leverage appropriate modellingtechniques to produce a model of the current and forecasted performance,capacity and throughput of the <strong>IT</strong> resources.Assess current performance and capacity of <strong>IT</strong> resources to determine ifsufficient capacity and performance exist to deliver against agreed-uponservice levels.Conduct performance and capacity forecasting of <strong>IT</strong> resources at regularintervals to minimise the risk of service disruptions due to insufficientcapacity or performance degradation, and identify excess capacity forpossible redeployment. Identify workload trends and determine forecasts tobe input to performance and capacity plans.DS3.4 <strong>IT</strong> Resources Availability Provide the required capacity and performance, taking into account aspectssuch as normal workloads, contingencies, storage requirements and <strong>IT</strong>resource life cycles. Provisions such as prioritising tasks, fault-tolerancemechanisms and resource allocation practices should be made. Managementshould ensure that contingency plans properly address availability, capacityand performance of individual <strong>IT</strong> resources.DS3.5 Monitoring and Reporting Continuously monitor the performance and capacity of <strong>IT</strong> resources. Datagathered should serve two purposes:• To maintain and tune current performance within <strong>IT</strong> and address such issuesas resilience, contingency, current and projected workloads, storage plans,and resource acquisition• To report delivered service availability to the business, as required by the----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Pagina 115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!