Chapter 4 Project Basics 99<br />

CHAPTER 4<br />

Project Basics<br />

<strong>ITEM</strong> ToolKit can be used at the project level to examine the overall reliability of one or more systems. Performing<br />

reliability analysis on a project can help lower costs and reduce repairs and maintenance.<br />

A project can be analyzed under any of the methods or standards that are available as part of ToolKit. In addition, any<br />

combination of system types can be included in a project. For example; in a project containing six systems, two could be<br />

analyzed for failure rates under the MIL-217 prediction standards, the third could be analyzed for failure rates under the<br />

Bellcore prediction standards, the fourth could be analyzed for reliability analysis (RBD), and the fifth and sixth could be<br />

analyzed for failure modes and effects (FMECA)/Fault Tree analysis.<br />

This chapter includes information about:<br />

1. Creating a New Project<br />

2. Opening a Project<br />

3. Cutting, Copying, and Pasting Systems<br />

4. Editing Project and System Properties<br />

5. Saving a Project<br />

6. Closing a Project<br />

7. Exiting ToolKit