13.09.2015 Views

ITEM TOOLKIT

ITEM Toolkit Manual

ITEM Toolkit Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

160 <strong>ITEM</strong> ToolKit Getting Started Guide<br />

The information entered for a project is only for the project level, and its entry is optional. The table below displays each<br />

field that is available for a project and what each field pertains to:<br />

Field<br />

Description<br />

Title<br />

The Project Title<br />

Name<br />

Project Name<br />

Part Number<br />

Project Part Number<br />

LCN<br />

Logistic Control Number<br />

Circuit Ref<br />

Reference Identification Number (for internal purposes)<br />

Analyst<br />

The person performing the RBD calculation<br />

Compiled By<br />

The person who gathered the data for this analysis<br />

Description<br />

Description of the project<br />

Function Description What the project/system does<br />

Notes<br />

Any other pertinent information on the project<br />

Approved By<br />

The person required to sign off on the project<br />

The following fields will display results only if a prediction system is part of the project<br />

Target Rate<br />

Acceptable number of failures for the project (Failures Per Million Hours)<br />

Life Time<br />

Project life time given in hours<br />

Redundancy<br />

Redundancy Flag<br />

Failure Rate<br />

Will display total Project failure rate once analysis is complete<br />

Unavailability<br />

The Project unavailability once the analysis has been run<br />

MTBF<br />

Mean Time Between Failures for the project

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!