Chapter 11 SpareCost 243<br />

The following fields will display results only if a prediction system is part of the project<br />

Target Rate<br />

Acceptable number of failures for the project (Failures Per Million Hours)<br />

Life Time<br />

Project life time given in hours<br />

Redundancy<br />

Redundancy Flag<br />

Failure Rate<br />

Will display total Project failure rate once analysis is complete<br />

Unavailability<br />

This box will display the Project unavailability once the analysis has been run<br />

MTBF<br />

Mean Time Between Failures for the project description<br />

8. From the Add Menu, select SpareCost System. The SpareCost system and project headers are added.<br />

9. In the System Window, click the SpareCost header. The system properties appear in the Dialog tab.<br />

10. In the Dialog tab, enter your system information by placing the cursor or clicking in the appropriate fields.<br />

11. The table below describes what could be entered and what each field and block of fields pertains to: