Understanding Analysis Results<br />

The following is a brief description of all the fields:<br />

Chapter 11 SpareCost 249<br />

Base Total Equipment:<br />

Base Util %:<br />

Base Support Period (Months)<br />

Base Repair Lead Time (days)<br />

Base Beyond Econ. Repair (%)<br />

Base Target SOR (%)<br />

Base Spare Results<br />

Site No of Equip Fitted at Site<br />

Site Unsupported Period (Days)<br />

Site Util (%)<br />

Site Stock-Out-Risk (%)<br />

Site Spare Results<br />

Name<br />

Description<br />

Qty<br />

Cost<br />

F/Rate (fpmh)<br />

Bkup Stock<br />

Repl Stock<br />

Total Stock<br />

Actual SOR (%)<br />

Name<br />

Description<br />

Qty<br />

Cost<br />

F/Rate (fpmh)<br />

Exp No of Fails<br />

No of Spares<br />

Actual SOR (%)<br />

SUMMARY VIEW<br />

Number of equipments expected to be in service and supported from base.<br />

Overall average utilization for all equipments throughout the period being modeled.<br />

Operational period for Base during which no replenishment of spares takes place.<br />

Average time that it takes to repair or replace equipments.<br />

Percentage of failed equipments that will be beyond economic repair.<br />

Target Stock-Out-Risk at the Base.<br />

Total number of Spare and Total Cost (in thousands) at the Base.<br />

Number of equipments being supported at the Site.<br />

Operational period for Site during which no replenishment of spares takes place.<br />

Average percentage of time for which the equipments on a Site operate.<br />

Target and Actual Stock-Out-Risk at the Site.<br />

Total number of Spare and Total Cost (in thousands) at the Site.<br />

BASE SPARE RESULTS<br />

Name of the equipment.<br />

Description of the equipment.<br />

Quantity of equipment.<br />

Cost of the equipment.<br />

Failure rate of the equipment in failure per million hours.<br />

Number of equipments in the Back up Stock.<br />

Replacement Stock.<br />

Total number of equipments in Stock.<br />

Actual Stock-Out-Risk at the Base.<br />

SITE SPARE RESULTS<br />

Name of the equipment.<br />

Description of the equipment.<br />

Quantity of equipment.<br />

Cost of the equipment.<br />

Failure rate of the equipment in failure per million hours.<br />

Expected number of equipments to fail during the unsupported period of the Site.<br />

Number of spare equipments at the Site.<br />

Actual Stock-Out-Risk at the Site.