13.09.2015 Views

ITEM TOOLKIT

ITEM Toolkit Manual

ITEM Toolkit Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 10 MainTain 231<br />

Defining the Maintenance Philosophy & Fault Isolation Resolution for Each Ri Set<br />

1. Select the first RI (Replaceable Item) in the system and click the “Fault Isolation to a Group of RI’s in the General<br />

dialog tab. The Maintenance Philosophy & Fault Isolation dialog tab becomes active.<br />

2. Click on the Maintenance Philosophy & Fault Isolation dialog tab.<br />

3. Click on New Group button (A) and the RI Group name will be set as “Group 1” (B) and tick Group Replacement in<br />

the “Isolation to a Group of RI’s” section (C) to set the maintenance philosophy for the group.<br />

B<br />

C<br />

A<br />

4. Click the Add button (D) twice in the Fault Resolution section (still in the Maintenance Philosophy & Fault Isolation<br />

dialog tab).<br />

5. Click in the “Resolution %” for the first line just inserted (E) and change the number to 20%.<br />

6. Leave the “No. of RI’s” set to 1 for the first line and click in the Resolution % for the second line inserted.<br />

7. Leave the “Resolution %” at 100% and change the “No. of RI’s” to 2 (F).<br />

E<br />

D<br />

F<br />

8. You have now said that 20% of the time the operator/maintenance technician will be able to isolate the fault to 1 RI,<br />

and for the rest of the time (100%), the operator/maintenance technician will be able to isolate the fault to 2 RI’s.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!