13.09.2015 Views

ITEM TOOLKIT

ITEM Toolkit Manual

ITEM Toolkit Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

244 <strong>ITEM</strong> ToolKit Getting Started Guide<br />

Field<br />

Title<br />

Name<br />

Part Number<br />

LCN<br />

Circuit Ref<br />

Analyst<br />

Approved by<br />

Description<br />

Function Description<br />

Notes<br />

Compiled by<br />

Stock-out-Risk (%)<br />

Unsupported Period (days)<br />

No of Equipment per Site<br />

Average utilization (%)<br />

Repair Lead Time<br />

Replenishment Period<br />

(Month)<br />

Total Number Fitted<br />

Overall Utilization (%)<br />

Beyond Economic Repair<br />

(%)<br />

Stock-out-Risk (%)<br />

Description<br />

System Title.<br />

Unique Reference Identifier for the System.<br />

System Part Number.<br />

Logistic Control Number.<br />

Circuit Reference Number.<br />

Name of the person performing the SpareCost Analysis.<br />

Name of the person who was required to sign off on the SpareCost project.<br />

Description for this System.<br />

Purpose/Description of this system.<br />

Any other pertinent information about this system.<br />

Name of the person who gathered the data for the SpareCost Analysis.<br />

Site Spares<br />

Risk a Site bears, that its spares will be insufficient during the unsupported period to meet<br />

demands due to equipment failure.<br />

Operational period for a site during which no replenishment of spares takes place.<br />

Number of equipments being supported at the site.<br />

Average percentage of time for which the equipments on a site operate.<br />

Base Spares<br />

Average time that it takes to repair or replace line items.<br />

Early in-service life for which the base stock is to be purchased.<br />

Number of line items expected to be in service and supported from base at the end of the<br />

replenishment period.<br />

Overall average utilization for all equipments throughout the period being modeled.<br />

Average proportion of failed items that will be beyond economic repair.<br />

The value here is used for each item in the range. It is not the same value as the target<br />

value used for site spares optimization.<br />

12. Move the mouse to the System Window in the bottom left of the ToolKit screen and click the left mouse button to the<br />

system Header to make this the active window (A).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!