13.09.2015 Views

ITEM TOOLKIT

ITEM Toolkit Manual

ITEM Toolkit Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

134 <strong>ITEM</strong> ToolKit Getting Started Guide<br />

The information entered for a project is only for the project level, and its entry is optional. The table below displays each<br />

field that is available for a project and what each field pertains to:<br />

Field<br />

Title<br />

Name<br />

Part Number<br />

LCN<br />

Circuit Ref<br />

Analyst<br />

Compiled By<br />

Description<br />

Function Description<br />

Notes<br />

Approved By<br />

Target Rate<br />

Life Time<br />

Redundancy<br />

Failure Rate<br />

Unavailability<br />

MTBF<br />

Description<br />

The Project Title<br />

A Unique Reference Identifier<br />

Project Part Number<br />

Logistic Control Number<br />

Circuit Reference<br />

Person Performing the FMECA Analysis<br />

Person who gathered data for analysis<br />

What the project is<br />

What the project/system does<br />

Any other pertinent information on the project<br />

Person required to sign off on the project<br />

Acceptable number of failures for the project (Failures Per Million Hours)<br />

Project life time or mission time given in hours<br />

Redundancy Flag<br />

Will display total Project failure rate once analysis is complete<br />

This box will display the Project unavailability once the analysis has been run<br />

Mean Time Between Failures for the project description<br />

Adding a System<br />

A FMECA system may represent a single board, sub assembly or an entire system. The system can then be broken down<br />

into sub blocks, components and/or functions.<br />

1. Select the Add menu from the menu toolbar by clicking on it (A).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!