1 Destruction/Vandalism<br />

0 Disorderly Conduct<br />

1 Driving Under the Influence<br />

1 Drug/Narcotic Violations<br />

0 Bad Checks<br />

0 Liquor Law Violations<br />

0 Trespass Offense<br />

0 Drunkenness<br />

3 All Other Offenses<br />

4 <strong>Town</strong> By-Law, Traffic Arrests<br />

22 Total Crimes<br />

Motor Vehicle Accidents – Month <strong>of</strong> January 2013<br />

0 Major Property Damage Accident<br />

3 Minor Property Damage Accident<br />

0 Injuries<br />

3 Total Accidents<br />

CHATHAM HARBORMASTER DEPARTMENT<br />

PROFESSIONAL-COMPETENT-READY Committed to serving the maritime community in a fair and<br />

equitable manner to ensure the safe, environmentally friendly and lawful<br />

use <strong>of</strong> <strong>Chatham</strong>’s maritime resources and facilities.<br />

Operations:<br />

H-26 underway to tow disabled fishing vessel from the mooring to the dock.<br />

H-25B underway to rescue a stranded kite boarder on Monomoy Island.<br />

H-26 underway to retrieve a dinghy adrift in <strong>Chatham</strong> Harbor.<br />

H-26 underway to retrieve a 14’ skiff adrift in <strong>Chatham</strong> Harbor.<br />

H-26 underway to assist in righting a sunken skiff in Ryders Cove.<br />

Performed storm preparations in advance <strong>of</strong> winter storm “Nemo”. H-25B was removed<br />

from the water and secured on its trailer. Fish Pier buildings, docks and floats were<br />

secured. Additional storm lines were added to the H-26.<br />

Portable generator brought online to provide power to the Stage Harbor <strong>of</strong>fice and<br />

bathrooms during the storm.<br />

Conducted post “Nemo” cleanup. Trees, branches, a wooden walkway, four dinghies,<br />

sea weed and other debris were removed from the dinghy dock area at the Fish Pier.<br />

Water caused by storm surge, was removed from the fuel dispensers and the fuel valve<br />

pit in the parking lot at the Fish Pier.<br />

H-26 underway in <strong>Chatham</strong> Harbor to put two (2) flags and three (3) buoys back on<br />

station which were displaced during “Nemo”. Also replaced CH-1 buoy which was lost<br />

during the storm.<br />

H-25B underway to transport insurance adjuster to Adams camp on North Beach Island<br />

during demolition.<br />

H-25B underway to retrieve a buoy on the beach at Claflin Landing.<br />

Department Head Monthly Report to the <strong>Town</strong> Manager – February 2013 Page 21