Middle Road entrance. We are in the process <strong>of</strong> obtaining quotes to have the damaged<br />

fence repaired.<br />

Overhead Door <strong>of</strong> Southeastern Massachusetts repaired truck bay # 3’s overhead door.<br />

Representatives <strong>of</strong> JL Marshall were on site performing various “punch list” items.<br />

Thermal imaging <strong>of</strong> the MCCs throughout the facility was performed by Annese Electric.<br />

We received 2,973 gallons <strong>of</strong> Methanol from Univar.<br />

Sludge Dewatering Building<br />

Performed sludge dewatering as needed.<br />

We disposed <strong>of</strong> the sludge cake at the Yarmouth W.W.T.F.<br />

Stage Harbor Road Pumping Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

We performed weekly exercising <strong>of</strong> the emergency generator.<br />

Monomoy Fuel topped <strong>of</strong>f the emergency generator diesel fuel.<br />

Monomoy Tree Service removed a fallen tree located behind the station.<br />

Verizon repaired the telephone line at the station that had become inoperative.<br />

Queen Anne Road Pumping Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

We performed weekly exercising <strong>of</strong> the emergency generator.<br />

We de-ragged pump 2.<br />

Mill Pond Road Ejector Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

C.H.O.P.S. Pumping Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

Huckleberry Road Pumping Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

George Ryder Road Pumping Station<br />

Daily inspections and checks <strong>of</strong> the station were performed.<br />

Daily, weekly and monthly O&M requirements were met and completed utilizing<br />

computerized maintenance program work orders.<br />

Department Head Monthly Report to the <strong>Town</strong> Manager – February 2013 Page 27